My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LAMMERS
>
24100
>
2900 - Site Mitigation Program
>
PR0508110
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2020 4:07:36 AM
Creation date
2/13/2020 9:53:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0508110
PE
2950
FACILITY_ID
FA0006134
FACILITY_NAME
POMBO RANCH
STREET_NUMBER
24100
Direction
S
STREET_NAME
LAMMERS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
24002002
CURRENT_STATUS
01
SITE_LOCATION
24100 S LAMMERS RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• i °- + k I <br /> Pombo Property <br /> Excavation and Monitoring Well Installation <br /> laboratory) will then be introduced into the pump or bailer as a final stage of <br /> cleaning. This water will then be a pumped or gently poured into sample vial to <br /> be used as pump or bailer blanks. Thesc blanks will be tested only if their <br /> corresponding samples are found to contain contaminants. <br /> Immediately prior to sampling, water levels and well depth measurements will be <br /> taken in all wells at the site. Each well will be evacuated using a stainless steel <br /> bladder pump, which does not introduce air into the water column, or a Teflon <br /> bailer. The pH, temperature, and electrical conductivity of the water will be <br /> monitored as the well is evacuated. These parameters will be noted on a field log. <br /> Instruments calibrated to known stand ds will be used to monitor these <br /> parameters. At least 5 well volumes will be evacuated from each well, and more, <br /> if necessary, until the above parameters have stabilized. Wells that are de- <br /> watered before evacuation of 5 well volumes has been accomplished will be <br /> sampled upon 80 percent recovery of the i itial water level. The wells or other <br /> sampling points will be sampled in order of the least to the most contaminated, as <br /> best known or estimated. The samples will be pumped from a stainless steel <br /> bladder pump or carefully poured from a Teflon bailer into clean glass vials with <br /> Teflon-lined screw caps and half gallon plastic containers provided by the <br /> laboratory. Care will be taken to ensure t iat no air space exists in the vials by <br /> inverting to check for bubbles and re-sampl ng if necessary. <br /> The groundwater samples will be analyzed or extracted within 14 days according <br /> to their EPA methods. The samples shz 11 be analyzed for Total Petroleum <br /> Hydrocarbons (gasoline), BTX&E (Benzene, Toluene, Xylene, and Ethyl <br /> Benzene) and the Oxygenated compounds y EPA Method 8260. Analysis will <br /> be conducted by GeoAnalytical Laboratoric s. The minimum detection limits used <br /> for each analyte will be .0005 mg/l for B X&E, 0.001 mg/1 for the Oxygenated <br /> compounds (0.010 for tertiary-Butanol), an 0.05 far diesel and gasoline. <br /> P Oato <br /> Prepared By: y GE9JIFIF0 0. <br /> ROBERT FOURT <br /> L' U x <br /> 1= D, <br /> • � p �. <br /> 9T��o&EO��t� <br /> Robert Fourt, CHG Fps C <br /> Certified Hydrogeologist 4180 <br /> Michael J. Kloberdanz, A, REHS t� T <br /> California Registered Environmental Assessor 902.57 No.02157 <br /> California Registered Environmental Health Speci list 94783 * *. <br /> r <br /> 1(i <br />
The URL can be used to link to this page
Your browser does not support the video tag.