My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LAMMERS
>
24100
>
2900 - Site Mitigation Program
>
PR0508110
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2020 4:07:36 AM
Creation date
2/13/2020 9:53:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0508110
PE
2950
FACILITY_ID
FA0006134
FACILITY_NAME
POMBO RANCH
STREET_NUMBER
24100
Direction
S
STREET_NAME
LAMMERS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
24002002
CURRENT_STATUS
01
SITE_LOCATION
24100 S LAMMERS RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pambo Property ( 7! <br /> Subsurface Investigation <br /> plume in the area of B-3 and a minimurr of three monitoring wells. A well <br /> survey that shows the location of all agricultural, industrial, domestic, municipal <br /> and other wells located within a 2000-foot r idius of the site was also requested. <br /> 2.0 WORK PLAN <br /> M.J. Kloberdanz & Associates proposes to drill up to 4 Geoprobe borings to a maximum <br /> depth of 30 feet. Two to three soil samples will t e obtained from each boring location <br /> for laboratory analysis. Water samples will be obtained from all Geoprobe borings. The <br /> borings will be drilled in the area of the former underground tank location, B-3, at the <br /> 24100 Lammers Road property. At least one boring will be located in each of the <br /> suspected groundwater gradient directions to the north and east of B-3. Based on the <br /> results of the Geoprobe borings three groundwat r monitoring wells will be installed. <br /> Proposed locations of the wells will be submitted on a supplemental site map once the <br /> laboratory results of the Geoprobe borings are obtained. Soil samples will be collected at <br /> five foot intervals for geological interpretation Eind laboratory analysis as described <br /> below. <br /> The water samples shall be analyzed for Total Petroleum Hydrocarbons (gasoline & <br /> diesel), Oxygenated Compounds (method 8260), and BTX&E (Benzene, Toluene, <br /> Xylene, and Ethyl Benzene). <br /> A well survey that shows the location of all agricultural, industrial, domestic, municipal <br /> and other wells located within a 2000-foot radius o the site will be conducted. <br /> 2.1 Drilling <br /> Permits will be obtained as necessary for all wells (including borings) before <br /> drilling begins. The soil boring will be accomplished using a mobile mounted <br /> drilling rig employing the use of a hollow stem flight auger no less than 3 114- <br /> inch i.d. and 8 718 o.d. and/or Geoprob ® Systems drilling rig, Model 5400, <br /> employing the use of a 1.25"hollow probe rods. <br /> All drilling equipment will be thoroughly s eam-cleaned before drilling begins, to <br /> prevent the introduction of contamination from off site, and between borings to <br /> prevent cross contamination. <br /> The borings will be logged under the direct supervision of a registered <br /> professional using the Unified Soil Class Ification System. The color, texture, <br /> moisture, plasticity (if applicable), consistency of the earth materials, pertinent <br /> soil or bedrock characteristics, and any evidence of contamination will be noted. <br /> All water-bearing zones and the depths at which they were encountered will be <br /> noted on these logs. <br /> ,' <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.