Laserfiche WebLink
Pombo Property <br /> Subsurface Investigation <br /> All borings will be drilled in such a manner as to prevent cross contamination <br /> between strata. Exploratory soil borings within the unsaturated zone will be <br /> backfilled withijeWtomtemnd cement. <br /> Borings into the saturated zone will be drilled to a maximum of 20 feet beneath <br /> the top of the aquifer being explored. Any perching layers encountered will be <br /> investigated to a maximum thickness of 5 feet and will be backfilled with <br /> eoper-eft slurry, after a Bentonite seal has been placed. If a deeper aquifer is to be <br /> investigated, conductor casing will first be routed into place to seal off the upper <br /> aquifer(s), in series, if necessary, and drilling will proceed through the conductor <br /> casing after the grout has been allowed to set properly. If evidence of <br /> contamination is noted during the drilling the drilling will be halted until the <br /> responsible professional determines the advisability of deeper drilling. <br /> Upon termination, the boring into the sa ur ted zone will be completed as a <br /> monitoring well and backfilled with grout, after a Bentonite seal has <br /> been placed. The boring for the monitorinD, well will be of a diameter at least 4 <br /> inches greater than the 2 inch diameter oft e well casing to be used. <br /> The cuttings from the drilling operation will be containerized on-site during <br /> drilling for proper disposition. The proper method of disposal will be dependent <br /> upon results of laboratory analysis. This disposal will be the responsibility of the <br /> client unless other arrangements are made. <br /> 2.2 Well Construction <br /> All materials used in well construction will be thoroughly cleaned prior to <br /> introduction into the boring. A Bentonite or cement and Bentonite grout will be <br /> placed at the bottom of the boring as necessary. After the seal has been allowed <br /> to set long enough to support the weight of the casing, a 2- inch diameter well <br /> casing (PVC) with end cap and factory per orations for placement in the saturated <br /> zone (taking into account seasonal variation) will be placed in the boring. The <br /> screen and filter pack sizes will be as noted in the well construction drawing. The <br /> casing and end caps will be threaded or jo tied by stainless steel screws, no PVC <br /> cement will be used. The .filter pack will extend two feet above the perforated <br /> zone. A Bentonite seal 2- to 3-feet thick w 11 be placed in the annular space above <br /> the filter pack followed by a cement grout to the surface. Seal and filter pack <br /> elevations may change based on the underl ing geology. <br /> 2.3 Well Development and Sampling <br /> The well will be developed until the well m ater appears clear of sediment, or until <br /> an appropriate number of well volume (based upon the judgment of the <br /> responsible professional) have been evacuated. The water produced during well <br /> development will be contained and disposed of by the driller. The wells will be <br /> C) allowed to stabilize for twenty-four (24) hours prior to sampling. <br /> 4 <br /> E <br />