My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LAMMERS
>
24100
>
2900 - Site Mitigation Program
>
PR0508110
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2020 4:07:36 AM
Creation date
2/13/2020 9:53:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0508110
PE
2950
FACILITY_ID
FA0006134
FACILITY_NAME
POMBO RANCH
STREET_NUMBER
24100
Direction
S
STREET_NAME
LAMMERS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
24002002
CURRENT_STATUS
01
SITE_LOCATION
24100 S LAMMERS RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> Pomho Property <br /> Subsurface Investigation <br /> All soil and groundwater samples will be properly labeled with date collected, <br /> project number, sample coordinator, and sarnple identification. Field records will <br /> document the above information and other significant data, such as names of on- <br /> site personnel, sampling methods, date and time of sampling, the number of well <br /> volumes removed before sampling, preservatives added, and any filtration <br /> performed on samples. <br /> The samples will be refrigerated immediately for delivery to the laboratory and <br /> will under no circumstances be opened by anyone other than laboratory personnel. <br /> Chain of Custody records will be maintained at all times. <br /> 2.4 Soil Sampling <br /> All soil sampling equipment will be thoroughly steam-cleaned before and <br /> between sampling to prevent cross contamination. Relatively undisturbed soil <br /> samples will be taken at intervals of not more than 5 feet in order to evaluate the <br /> subsurface materials, however, this sampling interval may be waived in saturated <br /> sands in which sample recovery is not possible. <br /> The soil samples will be taken using a Geo robe' core sampler with plastic liners. <br /> The sampler will be pushed (Direct Pu;h Technology) continuously by the <br /> hydraulically powered, percussion system. For augured borings the soil samples <br /> (71 will be taken using a California Modified Split Spoon sampler with brass liners. <br /> The sampler will be driven by a 140 pounc hammer repeatedly falling 30 inches. <br /> The blow counts necessary to drive the sa pier will be recorded for each 6-inch <br /> interval to help evaluate the consistencies of the materials. <br /> The laboratory samples will not have head space and will be immediately sealed <br /> in their liners using aluminum foil lined p1 istic caps. The remaining sample will <br /> be removed from its liner to be used as an Edde to the on-site geologist in logging <br /> the material at that depth. <br /> Soil samples collected for analysis will be analyzed for Total Petroleum <br /> Hydrocarbons (gasoline & diesel), BTX&E (Benzene, Toluene, Xylene, and Ethyl <br /> Benzene) and MTBE by method 8020. The minimum detection limits used for <br /> each analyte will be .005 mg/kg for BT &E, 0.01 mg/Kg for the Oxygenated <br /> compounds (0.1 mg/Kg for tertiary-Butanol), 1.0 mg/Kg for gasoline, and 2.5 <br /> mg/Kg for diesel. <br /> 2.5 Groundwater Sampling <br /> A travel blank provided by the laboratory will accompany the sample vials from <br /> the time they are picked up from the lab to the time they are delivered to the lab. <br /> This travel blank should be listed on the Chain of Custody but will be analyzed <br /> only if all samples contain the same contarr inants. <br /> 5 <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.