My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FYFFE
>
305
>
3000 – Underground Injection Control Program
>
PR0515446
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 2:29:48 PM
Creation date
2/13/2020 11:26:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3000 – Underground Injection Control Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515446
PE
3030
FACILITY_ID
FA0012150
FACILITY_NAME
NAVAL COMPUTER TELECOMMUNICATIONS
STREET_NUMBER
305
STREET_NAME
FYFFE
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
02
SITE_LOCATION
305 FYFFE AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGS <br /> 1.0 INTRODUCTION <br /> This Field Investigation Work Plan (Work Plan) for Oil/ Water Separator (OWS) Sites at <br /> Buildings 12, 410A and 508 at the Naval Computer and Telecommunications Station <br /> (NCTS), San Diego Detachment, Stockton, California has been prepared in accordance <br /> with Delivery Order (DO) No. 16, issued by the U.S. Department of the Navy (Navy) <br /> Engineering Field Activity, West (EFA-West), under its Contract Number N62474-95-0- <br /> 2523. Chemical analytical results of collected soil and groundwater samples will be <br /> used, if appropriate, for documentation of No Further Action Request requirements, as <br /> described in the Tri-Regional Board Staff Recommendations for Preliminary <br /> Investigation and Evaluation of Underground Tank Sites (RWQCB, 1996). The OWS <br /> sites are currently under California Department of Toxic Substances Control (DTSC) <br /> conditionally exempt permits. The work proposed herein will be conducted to support <br /> closure of the OWS sites and cancellation of their permits, as part of the transfer of <br /> these properties to the Port of Stockton. <br /> This Work Plan presents the objectives and overall technical approach of the field <br /> investigation at these OWS sites. Remaining sections of this Work Plan include: <br /> • Section 2 — Installation History <br /> • Section 3 — Proposed Site Investigation <br /> • Section 4 — Site Closure Requirements <br /> • Section 5 — Schedule and Submittals <br /> • Section 6 — References <br /> 1 <br /> \\LAURA\C\W�n6C',.VPCCCS%95-CLTS\1,995550304pkWork Plan\Work P!an.acc <br />
The URL can be used to link to this page
Your browser does not support the video tag.