Laserfiche WebLink
AGS <br /> saddle within the vault. The connecting subsurface waste all pipe enters the vault from <br /> the side and connects to the top of the tank. Additional tank and vault details and other <br /> site information are included in the construction plans (Appendix A). <br /> 3.1 .2 Previous Analytical Results <br /> Building 12 OWS. No hazardous waste investigations have been completed in the <br /> general area of the Building 12 OWS site. There are no records of any hazardous <br /> waste releases at the site; therefore, no environmental investigations were conducted <br /> and no analytical results are available. <br /> Building 410A OWS. An ongoing Installation Restoration Program (IRP) investigation is <br /> being conducted at Building 410 by Tetra Tech, Inc. This site is identified as Installation <br /> Restoration (IR) Site 6. The IR Site 6 investigation encompasses the general Building <br /> 410 area and extends southwestward to abut or partially overlap the adjacent Building <br /> 410A OWS site. The IR investigation involves the collection of soil and grab <br /> groundwater samples and monitoring well samples. The analytical results of the lR Site <br /> 6 investigation are not currently available. The results of the IR Site 6 investigation will <br /> be evaluated for the Building 410A OWS investigation and included in the investigative <br /> report, as appropriate. <br /> Building 508 OWS. No hazardous waste investigations have been completed in the <br /> general area of the Building 508 OWS site. There are no records of any hazardous <br /> waste releases at the site; therefore, no environmental investigations were conducted <br /> and no analytical results are available. <br /> 10 <br /> \\LAURA\C1Womn60\WPCCCS195-CLTS11995\950304VNcrk PlanVAca P'an <br />