Laserfiche WebLink
TABLE 1 <br /> REASONABLE COST BREAKDOWN <br /> # Task* Reasonable Cost $ Comments/Changes <br /> 1 Regulatory Negotiation for Best $0 Completed tasks are not eligible for cost pre- <br /> Available Testing and approval. Estimated costs appear excessive. <br /> Remediation of Separated TPH Reasonable costs will be determined at time <br /> and Plumes in Groundwater of reimbursement. <br /> 2 Revision of Initial Workplan for $0 Completed tasks are not eligible for cost pre- <br /> Additional Groundwater Testing, approval. Refer to Workplan dated July 23, <br /> Cost Benefit Analysis for 2001 . Estimated costs appear excessive. <br /> Additional Wells and Types of Reasonable costs will be determined at time <br /> Wells, Change Size of of reimbursement. <br /> Excavation Pit <br /> 3 Health and Safety Plan $0 Completed tasks are not eligible for cost pre- <br /> approval . Estimated costs appear excessive. <br /> Reasonable costs will be determined at time <br /> of reimbursement. <br /> 4 Workplan for Well Construction, $0 Information should be included in the initial <br /> Hollow Stem vs. Direct Push workplan (refer to Task #2) . <br /> Drilling Methods Development: <br /> Density, Diameter, Depth of <br /> Well and Specifications for <br /> Excavation and Shoring. Soil <br /> Cross Sectional Analysis for <br /> Determination of Screening <br /> Depth, Excavation Methods, and <br /> Shoring Standards <br /> 5 Health and Safety Plan — Well $0 Health and Safety issues pertaining to the <br /> Installation well installation should be included in the <br /> overall project Health and Safety Plan (refer <br /> to Task #3). <br /> 6 Water Treatment Systems $0 Based on information provided in the San <br /> Joaquin regulatory directive dated October <br /> 26, the depth of the excavation has been <br /> limited at 14 to 15 feet and dewatering is not <br /> necessa <br /> 7 Cone Penetrometer Test $0 Out of Scope Task <br /> Const/Benefit Analysis <br /> 8 Hand Augering Cost/Benefit $0 Out of Scope Task <br /> Analysis-Usage Reserved for <br /> Post Cleanup <br /> 9 Determine Feasibility and Cost $0 Out of Scope Task <br /> Benefit Analysis for Additional <br /> Vapor Testing. Vapor Testing to <br /> be Performed After Completion <br /> of Excavation, Implementation <br /> after Remediation, If Necessary. <br /> California L+b rironmenta/Protection Agency <br /> a.,a ReGyc/edPnper <br />