Laserfiche WebLink
# Task* Reasonable Cost Comments/Changes <br /> 10 Pump Test Cost/Benefit $0 Out of Scope Task <br /> Analysis-Well Density Required, <br /> Placement Screening <br /> 11 Determine Density and Location $0 Completed tasks are not eligible for cost pre- <br /> of All Site Borings and Wells. approval. <br /> 12 Determining Feasibility of $0 Out of Scope Task <br /> Trench Pit vs. Excavation Due to <br /> the Location of the Building <br /> Structure, <br /> 13 Hydropunch Feasibility $0 Out of Scope Task <br /> Cost/Benefit Anal sis <br /> 14 Develop Request for Quotations $0 Completed tasks are not eligible for cost pre- <br /> for Sub-Contractors/Contact approval. <br /> Sub-Contractors to Obtain <br /> Prospective Bids for Excavation <br /> by Designing Excavation, <br /> Storage, Pumping, and <br /> Treatment Systems and Time <br /> On-Site. <br /> Completed tasks are not eligible for cost pre- <br /> 15 Evaluate and Determine $0 approval. <br /> Qualified Returned Sub- <br /> Contractor Bids , <br /> 16 Excavation Scheduling/Field $0 Excavation scheduling is incorporated in <br /> Work Task 32 under Project Supervision. <br /> Completed tasks are not eligible for cost pre- <br /> 17 Workplan For Backfill $0 <br /> Construction/Fill Methods in approval. <br /> Backwater and Excavation <br /> 18 Health and Safety Plan $0 Health and Safety issues pertaining to the <br /> excavation should be included in the overall <br /> project Health and Safety Plan (refer to Task <br /> #3 <br /> 19 Contingency Action Workplan $0 Information should be included in the initial <br /> for Shoring and Excavation — workplan (Refer to Task 1#2). <br /> Emergency Responses to <br /> Collapsing Excavation Pit, <br /> 20 Health and Safety Plan $0 Health and Safety issues pertaining to the <br /> excavation should be included in the overall <br /> project Health and Safety Plan (refer to Task <br /> #3 <br /> 21 BEII Professional Services On. $0 BEII oversight costs for excavation included <br /> Site Excavation, Pumping, and in Task 32. Based on the regulatory directive <br /> Water Storage letter dated October 26, 2001 , de-watering <br /> the excavation is not necessary. <br /> Califoi nit En rironmeifta/Piaotectioo Agency <br /> p„t;' FeeydedPnper <br />