My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LARCH
>
425
>
2900 - Site Mitigation Program
>
PR0541913
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 5:19:43 PM
Creation date
2/13/2020 11:48:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0541913
PE
2960
FACILITY_ID
FA0024043
FACILITY_NAME
FRONTIER TRANSPORTATION FACILITY
STREET_NUMBER
425
STREET_NAME
LARCH
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21220009
CURRENT_STATUS
01
SITE_LOCATION
425 LARCH RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
# Task* Reasonable Cost Comments/Changes <br /> 10 Pump Test Cost/Benefit $0 Out of Scope Task <br /> Analysis-Well Density Required, <br /> Placement Screening <br /> 11 Determine Density and Location $0 Completed tasks are not eligible for cost pre- <br /> of All Site Borings and Wells. approval. <br /> 12 Determining Feasibility of $0 Out of Scope Task <br /> Trench Pit vs. Excavation Due to <br /> the Location of the Building <br /> Structure, <br /> 13 Hydropunch Feasibility $0 Out of Scope Task <br /> Cost/Benefit Anal sis <br /> 14 Develop Request for Quotations $0 Completed tasks are not eligible for cost pre- <br /> for Sub-Contractors/Contact approval. <br /> Sub-Contractors to Obtain <br /> Prospective Bids for Excavation <br /> by Designing Excavation, <br /> Storage, Pumping, and <br /> Treatment Systems and Time <br /> On-Site. <br /> Completed tasks are not eligible for cost pre- <br /> 15 Evaluate and Determine $0 approval. <br /> Qualified Returned Sub- <br /> Contractor Bids , <br /> 16 Excavation Scheduling/Field $0 Excavation scheduling is incorporated in <br /> Work Task 32 under Project Supervision. <br /> Completed tasks are not eligible for cost pre- <br /> 17 Workplan For Backfill $0 <br /> Construction/Fill Methods in approval. <br /> Backwater and Excavation <br /> 18 Health and Safety Plan $0 Health and Safety issues pertaining to the <br /> excavation should be included in the overall <br /> project Health and Safety Plan (refer to Task <br /> #3 <br /> 19 Contingency Action Workplan $0 Information should be included in the initial <br /> for Shoring and Excavation — workplan (Refer to Task 1#2). <br /> Emergency Responses to <br /> Collapsing Excavation Pit, <br /> 20 Health and Safety Plan $0 Health and Safety issues pertaining to the <br /> excavation should be included in the overall <br /> project Health and Safety Plan (refer to Task <br /> #3 <br /> 21 BEII Professional Services On. $0 BEII oversight costs for excavation included <br /> Site Excavation, Pumping, and in Task 32. Based on the regulatory directive <br /> Water Storage letter dated October 26, 2001 , de-watering <br /> the excavation is not necessary. <br /> Califoi nit En rironmeifta/Piaotectioo Agency <br /> p„t;' FeeydedPnper <br />
The URL can be used to link to this page
Your browser does not support the video tag.