My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LARCH
>
425
>
2900 - Site Mitigation Program
>
PR0541913
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 5:17:53 PM
Creation date
2/13/2020 11:49:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0541913
PE
2960
FACILITY_ID
FA0024043
FACILITY_NAME
FRONTIER TRANSPORTATION FACILITY
STREET_NUMBER
425
STREET_NAME
LARCH
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21220009
CURRENT_STATUS
01
SITE_LOCATION
425 LARCH RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
405
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> E'C. Environmental Health Department <br /> DIRECTOR <br /> o <br /> 600 East Main Street Donna Heran,REHS <br /> mi isPROGRAM COORDINATORS <br /> Stockton, California 95202-3029 Robert McClellon,REHS <br /> Jeff Carruesco,REHS,RDI <br /> C9 I F O RNP Website: www.sjgov.org/ehd Kasey Foley,REHS <br /> Phone: (209)468-3420 <br /> Fax: (209) 464-0138 <br /> June 14, 2010 <br /> Messrs. Kirk Larson, PG, and Robert Trommer, CHG <br /> State Water Resources Control Board <br /> Division of Financial Assistance <br /> 1001 1 Street <br /> Sacramento CA 95814 <br /> Subject: April and May 2010 Draft Five-Year Review Recommendations, Caseworker <br /> Vicki McCartney's Sites <br /> San Joaquin County Environmental Health Department (EHD) has received and reviewed the <br /> draft annual five-year review update letter issued by the State Water Resources Control Board <br /> Cleanup Fund (CUF)for various sites referenced below and comments as follows: <br /> 3400 Newton Road, Stockton, CA; Claim Number 14353: The CUF concurred with the EHD's <br /> directive to conduct soil vapor extraction (SVE) and recommended that the responsible party <br /> (RP) expedite the cleanup. Our agencies are in agreement. The EHD has recently issued a 30- <br /> day letter to complete an SVE pilot test. <br /> 3105 S. EI Dorado Street, Stockton, CA; Claim Number 8489: The CUF repeated a <br /> recommendation that the EHD direct the RP to assess remedial technologies and implement <br /> active remediation to reduce contaminant mass and achieve water quality objectives (WQOs) in <br /> a timely manner. The EHD is in agreement with this recommendation and will issue such a <br /> directive upon conclusion of impending assessment work. A plan for continuous free product <br /> removal is also about to be implemented. <br /> 106 Second Avenue, Ripon, CA; Claim Number 1978: The CUF recommendation was to <br /> consider this site for closure. By letter dated March 3, 2010, the EHD informed the CUF of the <br /> remaining closure concern with this site, specifically: The contaminants are generally delineated <br /> for this release, except toward the north as demonstrated by impacted CPT grab groundwater <br /> samples collected from boring CPT3 near the center of Second Street,- therefore, the plume is <br /> undefined toward the north. As a municipal well was formerly located toward the northeast of <br /> the site, a work plan to obtain additional grab groundwater samples north and northeast of the <br /> site has been approved to complete plume delineation. Monitoring well MW-3 used to be the <br /> heavily impacted well, but the plume shifted to MW-2 between 2003 and 2005, and appears to <br /> be gradually declining in MW-2 since 2007. Without knowing the pumping history of the former <br /> municipal well, the EHD is concerned that the change in plume stability may be related to the <br /> change in the municipal well usage. Assuming favorable result from the grab groundwater <br /> samples, the EHD anticipates closing this site in six to nine months (to allow time to perform the <br /> field work, prepare and review the report of findings, and destroy monitoring wells). At this time <br /> April and May 2010 Annual 5-year Reviews Vickie's Sites.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.