My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LARCH
>
425
>
2900 - Site Mitigation Program
>
PR0541913
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 5:17:53 PM
Creation date
2/13/2020 11:49:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0541913
PE
2960
FACILITY_ID
FA0024043
FACILITY_NAME
FRONTIER TRANSPORTATION FACILITY
STREET_NUMBER
425
STREET_NAME
LARCH
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21220009
CURRENT_STATUS
01
SITE_LOCATION
425 LARCH RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
405
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L is Page 2 of 2 <br /> I just called Mr. Cole(he is copied above) in regards to stopping by the site, today, to find the MW-25 <br /> location, as well as to schedule the sampling. He informed that the well is in a gravel area,that the last <br /> sampling event,the crew did not request help from him or his onsite assistant (who could have quickly <br /> found it for them), thus the lack of sampling. The yard is usually busy with trailers,but he can work <br /> around the sampling activity. <br /> I asked Mr. Cole about whether sampling could be done the week after Christmas. He said they would <br /> be open Mon., Tues. and half day on Wednesday. I told him that I thought Tuesday might be a good <br /> start day; I conferred with our engineer/sampling technician, Erik Lervaag,who said that Monday start <br /> would be fine. He thought he could finish within the three days available. <br /> In summary -no well finding today, and sampling on 12/28-30. 1 understand that you will be <br /> coordinating with the SJCEHD in regards to alerting them of the sampling event dates. <br /> We have the capability to purge directly into drums in the vehicle,which avoids needing to leave drums <br /> at the site. <br /> We will need chain of custodies or your lab, at your earliest convenience. <br /> We will assume that Erik contacts Mr. Cole or the office(you provided the numbers) in the event that <br /> the timing needs to change. <br /> Please advise if I have missed anything. <br /> Thanks! <br /> Olivia Jacobs <br /> 510-590-1099 <br /> Sent from my Verizon Wireless B1ackBerry <br /> 12/18/2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.