My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 3
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LARCH
>
425
>
2900 - Site Mitigation Program
>
PR0541913
>
SITE INFORMATION AND CORRESPONDENCE_FILE 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 5:53:25 PM
Creation date
2/13/2020 11:52:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 3
RECORD_ID
PR0541913
PE
2960
FACILITY_ID
FA0024043
FACILITY_NAME
FRONTIER TRANSPORTATION FACILITY
STREET_NUMBER
425
STREET_NAME
LARCH
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21220009
CURRENT_STATUS
01
SITE_LOCATION
425 LARCH RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 7 <br /> Vicki McCartney [EH] <br /> From: Vicki McCartney [EH] <br /> Sent: Friday, April 25, 2014 4:14 PM <br /> To: 'Javad M' <br /> Subject: RE: Revised work plan for groundwater remediation at Frontier Transportation Facility in Tracy <br /> Hi Javad, <br /> I have reviewed the work plan; Nuel Henderson has not reviewed the work plan but briefly when I discussed <br /> sampling at this site, Nuel expressed concern about sampling all wells except the ones being destroyed. Nuel is <br /> concerned about the expense of sampling all of the wells. We may recommend only sampling some of the wells <br /> after Nuel has reviewed the work plan. <br /> I tried to tape the maps together(Figures 4 through 9)that you submitted in your email. Nothing matched and I <br /> could not determine anything from the maps. Please send me the 11-by-17 inch maps. I need to review them. <br /> Things to check in your current work plan are: <br /> 1. Page 7 -check the gallons of water removed during DPE in February 2012; 1 read that 105,445 gallons <br /> were removed, not 102,150 gallons. <br /> 2. The manifest stated that 4,400 gallons of water were removed during the depth-discrete pumping test <br /> instead of 3,500 gallons. Please check this. <br /> 3. Page 8-Section 6.2.1 describes the two methods proposed to destroy the wells but there is no mention to <br /> refer to Table 3 to see which wells will be destroyed by pressure grouting and which wells will be over- <br /> drilled. Include a reference to this table. <br /> 4. Table 2 -TBA was detected in MW-1 at 118 ug/L instead of ND. <br /> 5. 1 am having great difficulty reading red print on top of red outlines of contamination in the figures. Can you <br /> switch to another color for the outline of the plume when submitting your figures to me? I will review the <br /> figures in your work plan once I receive the hardcopy. <br /> 6. Groundwater Purging and Sampling Procedure-please purge at 100 milliliters per minute and include a <br /> pump rinsate blank when sampling. <br /> Thank you Javad and have a great weekend. <br /> Vicki McCartney, Senior REHS <br /> San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue <br /> Stockton, California 95205 <br /> Phone: (209)468-9852 <br /> Email: vmccartnev(d,)sicehd.com <br /> .All <br /> From: Javad M [mailto:jmasoudi@emscorp.us] <br /> Sent: Friday, April 25, 2014 2:23 PM <br /> To: Vicki McCartney [EH] <br /> Subject: Re: Revised work plan for groundwater remediation at Frontier Transportation Facility in Tracy <br /> 4/25/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.