Laserfiche WebLink
I 1 . HEALTH AND SAFETY PLAN <br /> i � <br /> Blakely Environmental Investigations, Inc. (BEII), has established this site-specific Health and Safety Plan <br /> _l (HASP) as part of he work plan for all individuals engaged in field assessment activities at the Frontier <br /> Transportation property located at 425 Larch Road, Tracy, CA. All site work shall be conducted in a safe manner <br /> and comply with EPA, state and local regulations, in particular OSHA 29 CFR, part 1910, and California <br /> Administrative Code Title 8 . In addition, all site work will comply with BEII Corporate Health and Safety Program <br /> and all supporting Standard Operating Procedures. This HASP may be modified during actual field activities, if <br /> necessary, as more information and site-specific data is obtained. <br /> Prior to any work on-site, an approved copy of this HASP (latest edition) shall be provided to all <br /> r ' employees and subcontractors by the Project Manager. Each subcontractor will be responsible for providing their <br /> own HASP. At a minimum the subcontractors' HASP must meet the requirements of this HASP. BEII will review <br /> and approve each subcontractor HASP prior to initiation of Feld work. <br /> c <br /> 1 .1 PURPOSE AND OBJECTIVES <br /> I <br /> The purpose of this site-specific HASP is to provide guidelines and procedures to ensure the health and <br /> llphysical safety of those persons working at the Frontier Transportation property. While it may be impossible to <br /> L 1 eliminate all risks associated with site work, the goal is to provide precautionary and responsive measures for the <br /> protection of on-site personnel, the general public and the environment. <br /> The HASP objectives are as follows: <br /> * Ensure the safety of all site personnel <br /> * Protect the public and the environment <br /> * Adhere to BEII Health and Safety procedures <br /> 1*2 IMPLEMENTATION <br /> : I <br /> This site-specific HASP, and any additions included in a subcontractor HASP, will be reviewed and the <br /> Field Team Review Form (Attachment 1) will be completed by all site personnel prior to their scheduled field work. <br /> Whenever the site-specific HASP is revised or amended, personnel will be instructed in the new procedures and <br /> required to complete a new Field Team Review Form. The site-specific HASP will be implemented in the field by <br /> BEII's Health and Safety Coordinator and/or designated Site Safety Officer. <br /> 2.0 BACKGROUND <br /> J <br /> 2.1 SITE LOCATION AND DESCRIPTION <br /> The site is located at 425 Larch Road in Tracy. The site is an operating truck yard. Petroleum <br /> hydrocarbon impacted soil and groundwater was identified at the site. <br /> i 2.2 SCOPE OF WORK <br /> Advance three monitoring wells to groundwater, excavate up to three exploratory trenches, and perform a <br /> soil gas survey. <br /> i .1 <br /> 3. RESPONSIBILITIES <br /> 3*1 HEALTH AND SAFETY COORDINATOR <br /> � I <br /> As BEII's Health and Safety Coordinator (HSC), Hiram Garcia is responsible for directing and <br /> implementing the HASP and ensuring that all BEII and subcontractor personnel have been trained in HASP <br /> procedures. The HSC will coordinate safety activities with subcontractors and serve as liaison with public officials <br /> who might wish to monitor health and safety activities on-site. The HSC will also ensure that proper protective <br /> equipment is available and used in the correct manner, that decontamination activities are carried out correctly, that <br /> i <br /> 1_� <br />