My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LARCH
>
425
>
2900 - Site Mitigation Program
>
PR0541913
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 7:07:47 PM
Creation date
2/13/2020 11:53:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0541913
PE
2960
FACILITY_ID
FA0024043
FACILITY_NAME
FRONTIER TRANSPORTATION FACILITY
STREET_NUMBER
425
STREET_NAME
LARCH
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21220009
CURRENT_STATUS
01
SITE_LOCATION
425 LARCH RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
672
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 � <br /> specific site hazards are noted and accounted for in the Work Plan and that employees have knowledge of the local <br /> emergency medical system. The HSC may conduct periodic site audits to ensure compliance with the HASP and to <br /> note any additional hazards or concerns. The HSC has stop-work authorization, which shall be executed upon <br /> determination that an imminent health or safety hazard exists. <br /> 3.2 DESIGNATED SITE SAFETY OFFICER <br /> ? As BEII's Site Safety Officer (SSO), James Jazmin is responsible for implementing the site-specific HASP <br /> ! in the absence of the HSC. The SSO shall conduct daily tailgate safety meetings and ensure that only authorized <br /> personnel are allowed at the site. In addition, the SSO shall ensure that the daily sign-in logs for site persons and <br /> visitors are maintained. The SSO shall report any unsafe acts or conditions to the HSC. <br /> The SSO also has stop-work authorization, which shall be executed upon determination that an imminent <br /> danger to life or health exists. If a stop-work order is issued, due to safety concerns, the HSC shall be contacted <br /> I <br /> mmediately and appropriate steps taken to correct the situation . <br /> 3.3 PROJECT MANAGER <br /> BEII Project Manager, David Blakely is the direct link between BEII and Frontier Transportation. He is <br /> responsible for directing all on-site operations, including the overall implementation of the Health and Safety <br /> Program. In addition, the Project Manager is responsible for ensuring that adequate resources and personnel <br /> protective equipment are allocated for the health and safety of site personnel. The Project Manager is also <br /> responsible for ensuring that the safety personnel (via the HSC) are given free access to all relevant site information <br /> that could impact health and safety. He will correct conditions or work practices that could lead to employee <br /> exposure to hazardous materials. <br /> J 3A OCCUPATIONAL MEDICAL CONSULTANT <br /> SAN BERNARDINO COMMUNITY HOSPITAL, BEH's Occupational Medical Consultant, will be <br /> available to answer medical questions and provide guidance in unexpected situations. The Medical Consultant will <br /> recommend appropriate medical monitoring for the site team members. <br /> 3.5 EMPLOYEES <br /> All BEII employees working at the site are responsible for reading and understanding the HASP. They <br /> will be held accountable for complying with all aspects of the HASP. <br /> 3.6 SUBCONTRACTORS <br /> j If they desire, subcontractors on the site may provide their own site Health and Safety Plan that must <br /> y incorporate, at a minimum, BEII's Health and Safety Plan . As described above, BEH's HSC and SSO have <br /> authority to ensure that subcontractor employees are following the BEH and subcontractor HASP provisions. <br /> 4. EMERGENCY PLANNING <br /> 4.1 EMERGENCY SERVICES <br /> s Figure 1 illustrates the location of the Frontier Transportation property with respect to the Hospital. If an <br /> emergency should occur on-site, the Emergency Medical System (911 ) should be activated. <br /> 1j 4.2 EMERGENCY TELEPHONE NUMBERS <br /> 9 Emergency telephone numbers shall be posted on-site and made immediately available at all times. These <br /> numbers shall include the following: <br />
The URL can be used to link to this page
Your browser does not support the video tag.