Laserfiche WebLink
t <br /> 1. HEALTH AND SAFETY PLAN <br /> ii <br /> Blakely Environmental Investigations, Inc. (BEII), has established this site-specific Health and Safety Plan (HASP) <br /> — as part of he work plan for all individuals engaged in field assessment activities at the Frontier Transportation property <br /> located at 425 Larch Road, Tracy, CA. All site work shall be conducted in a safe manner and comply with EPA, state and <br /> -- local regulations, in particular OSHA 29 CFR, part 1910, and CalifomiaAdministrative Code Tide S. In addition, all site <br /> work will comply with BEII Corporate Health and Safety Program and all supporting Standard Operating Procedures. This <br /> HASP may be modified during actual field activities, if necessary, as more information and site-specific data is obtained. <br /> Prior to any work on-site, an approved copy of this HASP (latest edition) shall be provided to all employees and <br /> subcontractors by the Project Manager. Each subcontractor will be responsible for providing their own HASP. At a <br /> minimum the subcontractors' HASP must meet the requu'ements of this HASP. BEII will review and approve each <br /> subcontractor HASP prior to initiation of field work. <br /> !' 1 1. 1 PURPOSE AND OBJECTIVES <br /> i. <br /> The purpose of this site-specific HASP is to provide guidelines and procedures to ensure the health and physical <br /> 1 safety of those persons working at the Frontier Transportation property. While it maybe impossible to eliminate all risks <br /> associated with site work, the goal is to provide precautionary and responsive measures for the protection of on-site <br /> personnel, the general public and the environment. <br /> j The HASP objectives are as follows: <br /> * Ensure the safety of all site personnel <br /> 1 * Protect the public and the environment <br /> * Adhere to BEII Health and Safety procedures <br /> L2 IMPLEMENTATION <br /> This site-specific HASP, and any additions included in a subcontractor HASP, will be reviewed and the Field Team <br /> Review Form (Attachment 1 ) will be completed by all site personnel prior to their scheduled field work: Whenever the site- <br /> , - � specific HASP is revised or amended, personnel will be instructed in the new procedures and required to complete a new <br /> Field Team Review Form. The site-specific HASP will be implemented in the field by BEIl's Health and Safety Coordinator <br /> - - and/or designated Site Safety Officer. <br /> j ( 2.0 BACKGROUND <br /> 2. 1 SITE LOCATION AND DESCRIPTION <br /> I- <br /> The site is located at 425 Larch Road in Tracy. The site contained 6 uderground storage tanks that were removed <br /> in 1995. Petroleum hydrocarbon impacted soil and groundwater was identified at the site. <br /> 2.2 SCOPE OF WORK <br /> Perform a soil vapor survey and advance four wells and one boring to approximately 20' bg to identify if previous <br /> underground storage of fuel has impacted the subsurface. <br /> 3. RESPONSIBILITIES <br /> 3A HEALTH AND SAFETY COORDINATOR <br /> As BEII's Health and Safety Coordinator (HSC), Toni Lec-Blakely is responsible for directing and implementing <br /> f the HASP and ensuring that all BEII and subcontractor personnel have been trained in HASP procedures. The HSC will <br /> coordinate safety activities with subcontractors and serve as liaison with public officials who might wish to monitor health <br /> and safety activities on-site. The HSC will also ensure that proper protective equipment is available and used in the correct <br />