Laserfiche WebLink
Bonng II Log Project Frontier Transportation Sid Supervisor J Jaminet 1 of 1 <br /> Well Number MW-19 Drilling Company- Weeks, Sebastopol Well <br /> Bonng Hole Depth 20' bgs Boring Method Hollow Stem Auger Start Time 0830 <br /> Depth to Water 14' Date Dnlled 08/02/05 Finish Time 0915 <br /> Graphic Well organic <br /> p Depth R o counts Sy bol Vapor Odor Moisture Color Sample Description and Comments <br /> Log Constr (ppm) <br /> 4 <br /> 6 ML 25 None Damp Brown Clayey silt <br /> 6 <br /> 5 <br /> 4 Strong Damp <br /> g CL 291 Hydro- to Brown Silty clay <br /> 7 carbon Dry <br /> 10 <br /> 12 Brown Silt ' <br /> 26 CL 2 $ None Damp y clay, water at 14 <br /> 15 <br /> 30 <br /> 6 Clayey sand, <br /> 12 SM 6 8 None Saturated Brownsome angular gravel (20 mm) <br /> 13 <br /> 20 <br /> 125 <br /> 30 <br /> 35 <br /> 40 <br /> I <br />