Laserfiche WebLink
Bonng I&II Log Project Frontier Transportation Id Supervisor J Jazmin et 1 of 1 <br /> Well Number MW-20 Drilling Company Weeks, Sebastopol Comments <br /> Boring Hole Depth 20' bgs Boring Method Hollow Stem Auger Start Time 0940 <br /> Depth to Water -10' Date Drilled 08/01105 Finish Time 1130 <br /> Graphic Well organic <br /> o Blow USCS Vapor Odor Moisture Color Sample Description and Comments <br /> Depth QCounts Symbol (ppm} <br /> Log Constr <br /> 2 <br /> 3 CL 36 None Light Brown Silty clay,plastic <br /> 5 <br /> 8 <br /> 5 <br /> ' 12 CL 0 None Light Brown Slltyclay, water at 9 5' <br /> 5 8 <br /> 10 <br /> 6 <br /> s 8 CL 36 None Light Brown Silty clay <br /> 15 <br /> 15 <br /> 6 <br /> 8 SM 0 None Saturated Brown Silty,clayeysand <br /> " 10 <br /> 20 <br /> 25 <br /> 30 <br /> 35 <br /> 40 <br />