My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_REMEDIAL INVESTIGATION REPORT 2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
55
>
2900 - Site Mitigation Program
>
PR0009302
>
ARCHIVED REPORTS_REMEDIAL INVESTIGATION REPORT 2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 8:47:33 PM
Creation date
2/13/2020 2:23:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
REMEDIAL INVESTIGATION REPORT 2000
RECORD_ID
PR0009302
PE
2960
FACILITY_ID
FA0004002
FACILITY_NAME
MORTON-ALCO
STREET_NUMBER
55
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13737004
CURRENT_STATUS
01
SITE_LOCATION
55 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
808
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Report Second Phase Subsurface tnvestiption <br /> City of Stoeiaon, Banner Island, Stockton,CA <br /> May 20, 1992 <br /> W0=.1D <br /> i <br /> 41 Groundwater Monitorine Well Installation <br /> The seven soil borings were subsequently completed as groundwater monitoring wells. The <br /> monitoring wells were constructed of 4-inch diameter F480 PVC well screen/casing and <br /> completed as shown on Figure 6 and the well logs (Appendix Q. A well screen slot size of <br /> 0.010-inch and a Lone Star 2/12 sand was used as the filter pack. Neat cement was used to seal <br /> the wells, in accordance with San Joaquin County and California Department of Water Resources <br /> guidelines. To protect the integrity of the well, a locking, water-tight well plug was installed <br /> Ion the well and locking steal well monument was concreted over the well. <br /> On March 18, 1992, the wellheads were surveyed vertically and horizontally to a common datum <br /> by Seigfried and Associates to provide accurate well locations. The well locations are plotted <br /> on a map, provided by the City, to be able to show the relationship between the location of the <br /> wells and possible redevelopment areas (Figure S). The survey data and pity map are nr- <br /> in Appendix D. <br /> S <br /> 4.3 Well Development and Groundwater Sampling <br /> On March 18 and 19, 1992, the seven monitoring wells installed by RESNA and two existing <br /> wells were developed, monitored, and sampled in accordance with the site Groundwater <br /> Monitoring and Sampling Protocol (Appendix A). Depth to water measurements ranged from <br /> 20.01 to 29.16 feet below the top of the well casings. Electrical conductivity measurements <br /> ranged from 721 to 1,136 gmhos/cm. The development and purge water is stored on site in <br /> drums approved for hazardous waste storage, pending laboratory analysi,.. Water samples were <br /> collected after purging a minimum of three well volumes (casing and sandpack). The water <br /> samples were submitted to Sequoia Analytical Laboratory (Redwood City, CA) for analysis of <br /> California Title 22 Metals and Volatile Organics (EPA method 8240). <br /> Rwosu.snr 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.