My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_SITE CHARACTERIZATION REPORT 1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
55
>
2900 - Site Mitigation Program
>
PR0009302
>
ARCHIVED REPORTS_SITE CHARACTERIZATION REPORT 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 7:22:23 PM
Creation date
2/13/2020 2:43:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
SITE CHARACTERIZATION REPORT 1999
RECORD_ID
PR0009302
PE
2960
FACILITY_ID
FA0004002
FACILITY_NAME
MORTON-ALCO
STREET_NUMBER
55
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13737004
CURRENT_STATUS
01
SITE_LOCATION
55 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7kedweII&Rollo <br /> On 14 October 1999, Blaine Tech developed the four wells (2AMW-12 through 2AMW-15) by <br /> using a surge block and purging the groundwater with a submersible pump. Following the <br /> ' purging, groundwater samples were collected from the four wells and a duplicate sample <br /> (2AMW-16) was collected from well 2AMW-14. <br /> 3.3 Area 2B <br /> 3.3.1 Soil and Grab Groundwater Sampling <br /> On 15 September 1999, Precision used a backhoe to dig one exploratory pit at Area 2B. Test pit <br /> 2BTP-1 was excavated to ten feet at the location shown on Figure 5. Soil samples were collected <br /> tat the locations shown on the test pit log in Appendix C. <br /> On 17 September 1999, Precision used the SD-1 direct push rig to collect soil and groundwater <br /> samples. Soil borings 2BB-1 and 2BB-2 were pushed to a depth of 10 feet and 2BB-3 was <br /> pushed to a depth of 25 feet. Soil Samples were collected at locations shown on the boring logs <br /> in Appendix C. Groundwater grab sampling was performed on boring 2BB-3. <br /> 3.3.2 Groundwater Monitoring Well Development and Sampling <br /> On 11 October 1999, THF installed one monitoring well under the direction of Treadwell & <br /> ' Rollo. Boring 2BMW-1 was drilled to a depth of approximately 30 feet. Soil samples were <br /> collected for laboratory analysis at the depths shown on boring logs in Appendix C and at the <br /> locations shown in Figure 5. Upon completion of the soil boring the monitoring well was <br /> installed. <br /> On 14 October 1999 Blaine Tech developed monitoring well 2BMW-1 by using a surge block <br /> and purging the groundwater with a submersible pump. Following the purging, groundwater <br /> samples were collected from the well using a disposable bailer. <br /> 10 <br /> 25910119.DGD 13 December 1999 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.