Laserfiche WebLink
Stantec <br /> L & M OPERABLE UNIT- THIRD QUARTER 2011 SITE STATUS, REMEDIAL SUMMARY, <br /> AND GROUNDWATER MONITORING REPORT <br /> October 28, 2011 <br /> 2.0 Groundwater Monitoring and Sampling <br /> 2.1 GROUNDWATER MONITORING AND SAMPLING PROCEDURES <br /> Quarterly groundwater sampling of 14 shallow wells (A-Zone) (MW-9, 2AMW-12, MW-18, <br /> MW-20 through MW-23, MW-25, MW-28, MW-30, MW-31, MW-33, MW-34, and MW-45), 15 <br /> B-Zone wells (MW-16, MW-24, MW-26, MW-27, MW-29, MW-32, MW-35, MW-42, MW-44, <br /> MW-51, and MW-56 through MW-60), eight C-Zone wells (MW-54, and MW-61 through <br /> MW-67), and eight D-Zone wells (MW-55, and MW-68 through MW-74), were performed by <br /> Stantec between July 18 and 21, 2011. Groundwater monitoring and sampling activities were <br /> performed as required by MRP No. R5-2004-0820 (Appendix A), which was issued by the <br /> RWQCB on May 6, 2004. MRP No. R5-2004-0820 is summarized in Table 1. <br /> On behalf of the city of Stockton, Wallace-Kuhl is responsible for monitoring and sampling at the <br /> portion of the South Shore Parcels identified as the MOU and the UOU. Five shallow wells, <br /> MW-3, MW-7, 2AMW-15, MW-37, and MW-38 are located in the MOU and UOU and are <br /> gauged and sampled by Wallace-Kuhl. Stantec's groundwater monitoring and sampling <br /> activities are conducted concurrently with Wallace-Kuhl; during 3Q11 Wallace-Kuhl gauged <br /> wells for depth to water, but did not sample. Wells MW-36 and 3MW-1 R, which were previously <br /> part of the MOU/UOU MRP, were destroyed by the city of Stockton on April 5, 2004 due to the <br /> development of the adjacent parcel. Well MW-6 was destroyed by the city of Stockton on June <br /> 21, 2007 due to excavation and construction activities in the area; MW-06R was reinstalled in <br /> close proximity in November 2008. Wells MW-4, MW-5, MW-8, MW-10, MW-11, MW-40, <br /> MW-53, and MW-39 were abandoned by the city of Stockton during 4Q08. Wells 2BMW-1 and <br /> MW-06R were abandoned by the city of Stockton during 2Q10 and 3Q10, respectively, due to <br /> the construction of the DMV building. <br /> Groundwater monitoring wells were sampled according to the requirements stated in MRP <br /> No. R5-2004-0820, with the exception of the following: <br /> • Shallow wells MW-1 and MW-2 have not been sampled since September 1999 and July <br /> 1990, respectively. There is no evidence that these wells still exist, and therefore, these <br /> wells are considered lost. <br /> • Wells MW-4, MW-5, MW-6, MW-8, MW-10, MW-11, MW-36, MW-39, MW-40, MW-41, <br /> MW-53, and 3MW1-R were previously destroyed due to Unocal excavation activities. <br /> MW-6 was reinstalled as MW-06R; however, MW-06R was subsequently abandoned by <br /> city of Stockton during 3Q10 due to construction of the DMV on the MOU. <br /> • Well 2BMW-1 was abandoned during 2Q10 due to the construction of the DMV building. <br /> Iffidewater7W Stockton(P2A)\QMRs\201 1\3Q1 1\3Q11 QSSR QRSR QMR Stockton_FINAL.doc 2.1 <br />