Laserfiche WebLink
The Celotex Corporation - 3 - 27 March 2001 <br /> Inspection Report <br /> x� <br /> Chiller <br /> a - - Chiller - <br /> Storm Drain <br /> Figure 1 -Staining on concrete shows evidence of chiller Figure 2-Chiller water discharge went into the storm <br /> water discharge. drain. <br /> IN <br /> JIM <br /> 4 � � <br /> f' <br /> a <br /> m� x- <br /> F <br /> Figure 3-Containers of chemicals,used in experimental Figure 4 - Chemical containers and freon tank in the <br /> trials,in the raw materials unloading area,outside the tank raw materials unloading area outside the tank room. <br /> room. <br /> 4741, <br /> _ a <br /> 1 <br /> Figure„5-Rail tank transports chemicals used in <br /> manufacturing. Figure 6—Chemical spills from rail tanks. <br /> Approved: <br />