Laserfiche WebLink
S E C O R - - - -- <br /> Ms. Devra Lewis <br /> May 24, 2005 <br /> Page 3 <br /> mineral spirits, and motor oil. The sample will then be quantified as the best match to these <br /> standards. This analysis will aid SECOR in evaluating if the reported result is the fuel <br /> specified, and not just the area under the peaks found in a pre-determined carbon range. <br /> SECOR will also request the laboratory to assess the degree of weathering of the fuel(s) <br /> present in the sample. <br /> REPORT <br /> A report will be prepared and submitted to the RWQCB following completion of field <br /> activities and receipt of all analytical data. The report will include groundwater analytical <br /> data, chain-of-custody records, conclusions, and provide further recommendations, if <br /> needed. <br /> SCHEDULE <br /> SECOR anticipates completing field activities within 3 to 4 weeks of the approval of this <br /> Work Plan. A report will be prepared and submitted to the RWQCB within 3 to 4 weeks <br /> following completion of field activities and receipt of analytical data. <br /> Should you have any questions or concerns regarding these activities, please contact <br /> George Forsythe of SECOR at (559) 271-2650 extension 235 or Jeffrey Cosgray of CPL at <br /> (281) 596-3564. <br /> Sincerely, <br /> SECOR International Incorporated <br /> S. FpRs'AO N <br /> David M. Evans ; m —�6413 eorge T. Forsythe, .G. <br /> Associate Engineer * Exp N01 * enior Geologist <br /> NA Q <br /> GTF <br /> F0F CAL��O <br /> Enclosures: <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan and Utility Location Map <br /> Figure 3 Historical Groundwater Flow Rose Diagram <br /> N:\Files\Projects\Chevron\Retail\#3-2792 Tracy Pipeline\REPORTS\2005 Chevron Pipeline Characterization Work Plan.doc <br />