Laserfiche WebLink
E- CCSR <br /> Ms. Devra Lewis <br /> August 31, 2004 <br /> Page 3 <br /> UTILITY MAP PREPARATION <br /> SECOR will meet with a private utility locator to locate utilities along West Grant Line Road. <br /> In addition, a map will be prepared depicting the location of all utilities found. <br /> REPORT <br /> A report will be prepared within 4 to 6 weeks of receiving of the Pipeline throughput and <br /> testing records. <br /> SCHEDULE <br /> SECOR is prepared to initiate assessment work within two weeks of approval of this Work <br /> Plan. SECOR would like the CRWQCB to consider the throughput and testing records may <br /> require up to 60 days to obtain from Chevron Pipeline. <br /> If you have any questions regarding the contents of this Work Plan, please contact either <br /> Robert (Bob) Cochran of Chevron at (925) 842-9655 or George Forsythe of SECOR at <br /> (559) 271-2650. <br /> ED GFO <br /> Sincerely, �5 T. F0,9 �p <br /> SECOR International Incorporated �,� oQ' s,A 0, <br /> CD No.6413 ^' <br /> Sherrie L. LangOF CA��FO George . Forsythe, R <br /> Staff Engineer Project Manager <br /> SILL <br /> Enclosures: <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> cc: Mr. Robert J. Cochran, Chevron Environmental Management Company, San <br /> Ramon, CA <br /> /Mr. Harlen Knoll, San Joaquin County — Environmental Health Department, <br /> Stockton, CA <br /> Mr. Criseldo Mino, Department of Development and Engineering Services, Tracy, <br /> CA <br /> CADocuments and Settings\gforsythe.SECOR\My Documents\Work Files\Chevron\Pipe Line\2004 Chevron Pipeline <br /> Characterization Work Plan (mod).doc <br /> 2 <br /> s <br /> f <br />