Laserfiche WebLink
07/2B/2004 15:22 209-577-6040 BOYETT PETROLEUM PAGE 04/1 <br /> .-Tank Gauging/SIR Equipment'. 0 Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> Mis section must be completed if in-tauk gauging equipment is used to perform leak detection monitoring. <br /> Copplete the followinz checklist: <br /> El'yes © No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> es ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> �dyes ❑ No* Was accuracy of system product level readings tested? <br /> ff,yes ❑ No* Was accuracy of system water level readings tested? <br /> es ❑ No* Were all probes reinstalled properly? <br /> Yes ❑ No's Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Com fete the followIn checklists <br /> ❑ Yes ❑ No* For meat start-up or annual equipment certification, was a�; 0.2 <br /> ated to velfy LLD performance? <br /> ❑ N/A (Check a . 1 apply) Simulated leak rate: ❑ 3 g.p.h.; ❑ 0A g.p. p.h. <br /> ❑ Yes ❑ No* Were all LLDs conk operational and accurate within re atony requirements? <br /> ❑ Yes O No* Was the testing apparatus pro v calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs,does the LL trio pro t flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine omad shut off if the LLD detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs, does t turbine automatically shut if any portion of the monitoring system is disabled <br /> ❑ N/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LL , does the turbine automatically shut off if any pot ' of the monitoring system malflmctions <br /> ❑ N/A or fails a test <br /> ❑ Yes ❑ No* Far ele nie LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> ❑ Yes ❑ No" MTe all items on the equipment manufacturer's maintenance checklist completed? <br /> ` In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> )page 3 of 3 03rot <br />