Laserfiche WebLink
Mr.Mike Oliphant—CEMC <br /> Soil Investigation Work Plan May 10,2013 <br /> Former Tracy Pump Station Page 3 of 3 <br /> • Log each borehole for lithology using the Unified Soil Classification System as a <br /> guide, including color, relative moisture content, and other observable and <br /> distinguishing characteristics(i.e., color changes, debris, rootlets). <br /> • Place investigation-derived waste in United States (U.S.) Department of <br /> Transportation-approved containers pending disposal. <br /> • Prepare a report describing the investigation,findings, conclusions,and <br /> recommendations. <br /> All field work will be directed by a California Professional Geologist. <br /> SCHEDULE <br /> SAIC will begin the field work when the necessary permits and site access agreements <br /> have been obtained. <br /> If you have any questions,please call me at(510) 466-7161. <br /> Sincerely, <br /> SAIC Energy,Environment& Infrastructure,LLC <br /> V <br /> Michael Hurd, CHG 0068 \S��RcD G-0 <br /> Senior Environmental Project Manager <br /> MICHAEL HURD l <br /> NO. 0068 <br /> Enclosures: CERTIFIED <br /> Figure 1. Vicinity Map HYDROGEOLOGIST <br /> r <br /> Figure 2. Site Map s�,Exp!'' <br /> ATF OF <br />