Laserfiche WebLink
Ultramar Station No. 3641 September 16, 2014 <br /> Stockton, California Health and Safety <br /> SITE SAFETY WORKPLAN <br /> PERIMETER <br /> ESTABLISHMENT: Use cones and/or barricades to secure work areas. Use vehicle to restrict <br /> access, if necessary. <br /> PERSONAL PROTECTION: Level of Protection: Level D <br /> Modifications: Rubber gloves <br /> Surveillance Equipment and Material: PID for monitoring hydrocarbon <br /> vapors. <br /> SITE ENTRY <br /> PROCEDURES: None. All non-work related personnel are restricted from the work area. <br /> DECONTAMINATION <br /> PROCEDURES: Personnel: Wash thoroughly with detergent solution and water. <br /> Equipment: Alconox wash and potable water rinse, if necessary. <br /> Pressure-wash drilling equipment between borings. <br /> FIRST AID: As applicable. <br /> WORK LIMITATIONS: Daytime hours; monitor work habits relative to heat or cold weather <br /> conditions <br /> INVESTIGATION-DERIVED <br /> MATERIAL DISPOSAL: Segregate solid from liquid waste in DOT-approved 55-gallons metal <br /> drums. Segregate soil cuttings and debris. Properly label drums and <br /> store for eventual disposal. <br /> TEAM COMPOSITION: Horizon Safety Officers: Emil D. Kruck <br /> Rexford Smith or assigned Horizon personnel <br /> 641 HASP09-14 <br /> Project No. 1641.01 ? HORIZON ENVIRONMENTAL INC. <br />