Laserfiche WebLink
Biazini Properties, Inc. D06105.01 <br /> April 12, 2000 Page B-3 <br /> A map showing the hospital location in relation to the site location is attached as Drawing B-1. <br /> B-2 Directions to the Site: From Dameron Hospital, travel west on West Acacia Street <br /> approximately % mile to West Picardy Drive. Turn left and travel northwest approximately 0.08 <br /> miles to Monte Diablo Avenue. Turn right and travel west approximately % mile to Interstate 5. <br /> Turn right and travel northwest approximately 4.5 miles to Hammer Lane. Turn right and travel <br /> west approximately 1 '8 mile to the project site. <br /> B-3 Direction from the Site to the Hospital: From the site travel east on West Hammer Lane <br /> approximately 1/8 mile to Interstate 5. Turn right on Interstate 5 and travel southeast <br /> approximately 4.5 miles to Monte Diablo Avenue. Turn left onto Monte Diablo Avenue and <br /> travel east approximately '/i mile to West Picardy Drive. Turn right travel southeast <br /> approximately 0.08 miles to the West Acacia Street. Turn left and travel approximately %z mile <br /> to Dameron Hospital. <br /> B-4 Air Monitoring Program and Respiratory Protection: If any unusual strong odors are <br /> noted, work will be temporarily discontinued and the source of the odor evaluated. In the event <br /> concentrations of hydrocarbon vapors measured in the breathing zone exceed 10 parts per million <br /> (the threshold limit value for benzene), work will be suspended and the site evacuated until <br /> engineering controls can be implemented to reduce the hazard. Respiratory equipment will <br /> available on-site and but will only be used if high levels of hydrocarbon vapors are detected and <br /> it is necessary to secure equipment prior to evacuating the site. <br /> B-5 Personal Protective Equipment: It is anticipated that the level of personal protection <br /> required for this project will be U.S. EPA Level D or modified Level C. Personal protection will <br /> only be modified to Level C in the event it is necessary for emergency evacuation of the site. <br /> Personal protective equipment for each member of the field team will be available on-site and <br /> used as may be required by field conditions. A summary of the personal protective equipment is <br /> as follows: <br /> • Full or half face respirators equipped with organic vapor cartridges; <br /> • Appropriate work clothing and/or Tyvek® coveralls; <br /> • Neoprene rubber gloves; <br /> • Steel-toed leather work boots or steel-toed rubber boots; <br /> • Safety glasses; and <br /> • Hardhats. <br /> Hardhats will be worn at all times. Goggles will be worn during steam cleaning operations. If <br /> required,the remaining personal protective equipment shall be put on before entering the immediate <br />