Laserfiche WebLink
Braga.:Properties. Inc. D06105.01 <br /> ,April .1'2. 2000 Page B-4 <br /> work area. The sleeves of the coveralls shall be outside of the cuffs of the gloves to facilitate <br /> removal of clothing. If at anytime protective clothing(coverall,boots or gloves)becomes torn,wet, <br /> or excessively soiled, they will be replaced immediately. <br /> No eating, drinking or smoking will be allowed in the vicinity of the operations. The project <br /> geologist will designate a separate area on-site for eating and drinking. Smoking will not be allowed <br /> at the facility except in designated areas. No contact lenses will be worn by field personnel. <br /> B-6 Cleanup/Decontamination Procedures: At the end of the workday,the following procedures <br /> will be used to allow for the safe removal and decontamination of personal protective equipment that <br /> may have been required. <br /> • Boots and gloves will be washed with a Alconox® detergent and tap water, then rinsed <br /> before removal. <br /> • Boot covers and coveralls will be removed and coveralls placed in a plastic bag for <br /> appropriate disposal. <br /> • Gloves will then be removed and placed in the plastic bag; hands will be washed with soap <br /> and water. <br /> • Spent protective clothing will be stored on-site in 55-gallon drums and properly disposed of <br /> after receipt of laboratory analyses. <br /> B-7 Person Responsible for Health and Safety at Site: Twining's project geologist will be the <br /> designated site safety officer for Twining personnel. His responsibilities will include <br /> implementation of the site safety work plan for Twining personnel involved with the field <br /> operations. <br /> B-8 Site Safety Meeting: Twining's designated project safety officer will conduct a site safety <br /> meeting prior to commencing work. All Twining personnel involved in the field work shall attend <br /> the site safety meeting and sign the attendance sheet. The following items will be covered during <br /> the meeting: <br /> B-8.1 Site Safety Meeting Agenda <br /> i. Project: 3422 West Hammer Lane, Stockton, California, Twining Project Number <br /> D06105.01 <br /> ?. Inclusive dates of field work, from: to <br /> 3. Personnel responsible for site safety: <br /> Ia. Division Manager: Walt Plachta <br />