Laserfiche WebLink
Biagini Properties, Inc. D06105.01 <br /> .4pri1 12, 2000 Page B-6 <br /> f. Site specific hazards and/or safety practices to be observed: Avoid dust clouds, <br /> avoid contact with soil, be aware of the slope on south side of site. <br /> 7. Engineering Controls on site: <br /> a. Traffic cones and warning tapes: set up to isolate work areas from public. <br /> b. Emergency warning devices and shut-off switches: insure driller, helper, and <br /> geologist are aware of the locations and operation of the emergency shut-off <br /> switches. <br /> c. Site specific controls and/or warning devices: to be determined. <br /> 8. Medical surveillance requirements: not applicable to this project. <br /> 9. Decontamination Procedures: <br /> a. Equipment and tools which may have been in contact with petroleum product <br /> and/or hazardous materials should be decontaminated with on site wash down. <br /> Rinsate from decontamination should be containerized in barrels and stored on site. <br /> b. Personal protective equipment will be decontaminated with detergent wash/clean <br /> water rinse (if required). Any clothing which has been saturated with potentially <br /> contaminated fluid will be disposed of in rinsate barrels. <br /> 10. Emergency Response Plan: <br /> a. Emergency evacuation signal and evacuation route: To be determined on <br /> site: <br /> b. Nearest accessible telephone: Project Truck (mobile phone). <br /> c. Nearest accessible first aid kit: Project truck <br /> d. Nearest portable fire extinguisher: Project truck <br /> e. Immediately notify authorities(call 911 if necessary)of any accident resulting in <br /> injury to personnel. Notify site supervisor and office as soon as possible. <br /> f Immediately notify site supervisor or geologist of any condition, event or <br /> circumstance which you believe to be hazardous or unhealthy. <br />