My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
15600
>
2800 - Aboveground Petroleum Storage Program
>
PR0515456
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2020 2:53:28 PM
Creation date
2/21/2020 1:36:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0515456
PE
2832
FACILITY_ID
FA0000174
FACILITY_NAME
JOES TRAVEL PLAZA
STREET_NUMBER
15600
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19620079
CURRENT_STATUS
01
SITE_LOCATION
15600 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> SPCC PLAN AMENDMENTS (40 CFR 112.5(a)) <br /> Technical Amendments <br /> j <br /> In the event of any change to the facility design, construction, operation, or maintenance that materially <br /> affects its potential for a discharge as described in §112.1(b)this SPCC plan must be amended. In the <br /> event that an amendment is necessary, it must be made within six months of the change requiring the <br /> amendment. Changes which require a plan amendment include,but are not limited to: <br /> • Commissioning or decommissioning oil storage containers <br /> • Replacing,reconstructing, or moving a container <br /> • Replacing,reconstructing,replacement, or installation of piping systems <br /> • Construction, demolition, or modification of secondary containment structures <br /> • Changes in type of oil stored in containers <br /> i <br /> Amendments to this plan that are made to address one or more of the above changes are considered <br /> technical changes and must be certified by a registered Professional Engineer in accordance with 40 <br /> CFR 112.3(d). <br /> Non-Technical Amendments <br /> Non-technical amendments may be made to thethoutert' cation of a Professional <br /> Engineer. Non-technical amendments include th ollowing: <br /> • Change in name or contact informa ' for the individuals listed in the plan <br /> • Change in name or contact ' orm or spill response or clean up contractors <br /> Any amendment,technical or non-t7chnth Plan must be recorded in Table B as described <br /> in the following section j <br /> SPCC PLAN REVIEW (40 CFRThe owner or operators must coation of the SPCC plan at least once every five <br /> years. If revisions to this SPCC plan are determined to be necessary during the five-year review,they <br /> should be made within six months of the review. If a technical amendment of the plan is required, a <br /> registered Professional Engineer shall certify the plan amendments in accordance with 40 CFR 112.3(d). <br /> Evidence of these reviews shall be recorded in this plan below, even if no amendment is necessary, at a <br /> minimum of every five years. .If an amendment is not required, state, "I have completed review and <br /> evaluation of the SPCC Plan on(date), and will not amend the Plan as a result." <br /> i <br /> I <br /> i <br /> i <br /> Joe's Travel Plaza <br /> 15600 Harlan Road,Lathrop,CA <br /> Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.