Laserfiche WebLink
• MonierLifetile, LLC <br /> Stockton / Lat • • <br /> Memo <br /> Ta File Stockton Environmental <br /> Fronx Jeff Smith <br /> CC: <br /> Date: 6/29/2002 <br /> Re: Waste pile and Berm Inspection 2nd Quarter 2002 <br /> On June 29 2002 an inspection was made of the Stockton waste pile. The inspection was made while <br /> walking the circumference of the waste pile. There is a concrete wall partially around the backside of <br /> the berm. The dirt berm that was used needs to be replaced with a more permanent type since it is <br /> effectively not in place. The bulk of it has blown away. The top of the pile had been graded and the <br /> overall condition is good. The asphalt area around the pile is in good condition but should be sealed <br /> again. <br /> 1 <br />