Laserfiche WebLink
MonierLifetile, LLC <br /> • • • • <br /> Memo <br /> TO: File Stockton Environmental <br /> Frorro Jeff Smith <br /> CC: <br /> Date: 9/28/2002 <br /> Ree Waste pile and Berm Inspection 3rd Quarter 2002 <br /> On September 28,2002 an inspection was made of the Stockton waste pile. The inspection was made <br /> while walking the circumference of the waste pile.There is a concrete wall partially around the backside <br /> of the berm. The dirt berm was replaced with an asphalt berm to connect the concrete curbs. The <br /> asphalt area around the pile is in good condition. There is still some space on the top of the pile. The <br /> overall stockpile and berm is in good condition. <br /> 1 <br />