My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2900 - Site Mitigation Program
>
PR0539520
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2020 4:50:46 PM
Creation date
2/21/2020 2:11:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0539520
PE
2950
FACILITY_ID
FA0022603
FACILITY_NAME
LIMITED PHASE II ESA
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pape Properties, Inc. January 11,2015 <br /> Limited Phase II ESA 10842 S Harlan Rd, French Camp, CA <br /> Phase II ESA Summary <br /> 1.1 Introduction <br /> This report presents the results of a Limited Phase II Environmental Site Assessment(Phase II ESA) <br /> conducted at 10842 South Harlan Road in French Camp, California (the"project site", Figure 1) by <br /> Caledonia Associates of Redding, California. The property owner is Beneto Properties, Inc.,of West <br /> Sacramento,CA. PacLease,a division of the Pape Group,shares this address with a diesel fuel cardlock <br /> currently operated by Ramos Oil, Inc., and leases portions of the project site to other businesses. The <br /> Phase I ESA and Limited Phase II ESA were conducted concurrently with Pape's lease, remodel, and use <br /> of the project site beginning in summer of 2014. The Phase 11 ESA included only the portion of the <br /> property that is utilized by Pape,delineated with a yellow border on the site Figures. <br /> Several motor-vehicle service and sales businesses are located adjacent to and in the vicinity of the <br /> project site. Most of these businesses include the use and/or storage of diesel fuel, motor oil,other <br /> hazardous materials and products on or adjacent to the project site. <br /> • The Ramos Oil cardlock facility's diesel dispensers and underground storage tank(UST) are <br /> located immediately northeast and east, respectively, of the project site. <br /> • Semi-trucks and trailers, related equipment,and service products and parts are routinely <br /> transferred between PacLease and Pape Kenworth, located immediately south of the project <br /> site. <br /> • Several trucking and transport businesses utilize the project site to access an adjacent parking <br /> yard (Interstate Trucking) and sublease space on the project site to park their trucks and trailers <br /> (Devine Intermodal Trucking and Sun Systems). <br /> 1.2 Previous Investigations <br /> The cardlock facility was the subject of a Phase I ESA conducted by MB Environmental Geology (M BEG) <br /> in 2004 during a change in the cardlock operator. Fuel constituents were detected in the initial soil <br /> assessment and the release of diesel fuel was reported to San Joaquin County Department of <br /> Environmental Health,the local oversight program (LOP or County), in December 2004. The LOP opened <br /> a leaking underground storage tank(LUST) case and ordered further investigation of the cardlock <br /> facility. In September 2006, a soil and groundwater assessment was conducted by Lee& Pierce <br /> Consulting Engineers (L&P). L&P reported that the direction of groundwater flow was northwest <br /> (roughly cross-gradient of the project site). L&P reported no constituents of concern detected in any of <br /> the soil or groundwater samples during their investigation. The monitoring wells were destroyed and <br /> the LOP closed the case in November 2007. Additional information may be found in L&P's Subsurface <br /> Investigation Summary Report, included as an Appendix to the Limited Phase I/ESA Work Plan for the <br /> project site (July 9, 2014, Caledonia Associates). <br /> ® PA004.02 P H I I(14) <br /> 1 l:\Pape\004 Kenworth\02.French Camp\2014\Phase II ESA.docx <br /> CALEDONIA <br />
The URL can be used to link to this page
Your browser does not support the video tag.