My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOLMAN
>
5247
>
2900 - Site Mitigation Program
>
PR0508235
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2020 5:23:17 PM
Creation date
2/21/2020 4:41:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0508235
PE
2950
FACILITY_ID
FA0008007
FACILITY_NAME
BLOSSOM FARMS
STREET_NUMBER
5247
STREET_NAME
HOLMAN
STREET_TYPE
RD
City
STOCKTON
Zip
95212
CURRENT_STATUS
01
SITE_LOCATION
5247 HOLMAN RD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k" K L E I N F E L D E R <br /> B-2.7 Decontamination of Equipment <br /> To reduce the potential for cross-contamination, augers and associated equipment are steam <br /> cleaned prior to drilling each boring. In addition, sampling equipment is cleaned with a <br /> trisodium phosphate or non-phosphate detergent wash and rinsed with distilled water prior to <br /> collecting each soil sample. <br /> B-2.8 Soil Boring Closure and Cutting Disposal <br /> Soil borings are closed immediately after the collection and logging of soil samples. Closure is <br /> accomplished by grouting the boring with a cement/bentonite slurry or as otherwise required. <br /> Drill cuttings will be placed in 55-gallon drums wrapped in plastic or spread around the boring <br /> and left on site for disposal by the site owner. If requested, Kleinfelder can coordinate disposal <br /> of soil and water after analytical results are available. <br /> B-3 GROUNDWATER WELL INSTALLATION <br /> B-3.1 Monitoring Well Construction <br /> Construction details for shallow groundwater monitoring wells are as follows: <br /> • The well casing are 2- or 4-inch inside diameter, flush threaded joint, schedule 40 PVC <br /> pipe. <br /> • The wells are constructed in 8- or 10-inch diameter borings. - <br /> Well screen sections are perforated with 0.010- or 0.020-inch factory-cut slots. <br /> • The wells are generally screened from 5 feet above to 15 feet below first groundwater. <br /> The screen length is reduced if an aquitard with a minimum thickness of 5 feet is <br /> encountered. If an apparent aquitard is encountered, the well is usually terminated 1 to 2 <br /> feet into the aquitard. Effort is made not to screen across two aquifers. If confined <br /> aquifer conditions or high vadose zone contamination are encountered, the well screen is <br /> usually not set above the depth of first encountered groundwater. Wells are usually not <br /> set in areas of suspected significant soil contamination. <br /> 20-3712-08.E02/2018R1090 Page B-4 <br /> © 1998,Kleinfelder,Inc. December 23, 1998 <br />
The URL can be used to link to this page
Your browser does not support the video tag.