My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOLMAN
>
5247
>
2900 - Site Mitigation Program
>
PR0508235
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2020 5:23:17 PM
Creation date
2/21/2020 4:41:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0508235
PE
2950
FACILITY_ID
FA0008007
FACILITY_NAME
BLOSSOM FARMS
STREET_NUMBER
5247
STREET_NAME
HOLMAN
STREET_TYPE
RD
City
STOCKTON
Zip
95212
CURRENT_STATUS
01
SITE_LOCATION
5247 HOLMAN RD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k" KLEINFELDER <br /> • The PVC pipe and end caps are steam cleaned prior to installation. <br /> • The annular space between the screen and the wall of the boring is backfilled with the <br /> appropriate clean sand to approximately 2 feet above the top of the perforated sections. <br /> Based on soil logs or a sieve test, modifications may be made regarding the size of sand <br /> to be used. Installation of the sand may require that the sand be tremmied, using clean <br /> water. <br /> • A 3- to 5-foot bentonite plug is placed above the sand pack to provide a seal against <br /> surface water infiltration and to reduce the potential for cement grout to infiltrate into the <br /> water. <br /> • The remaining annular space is filled to the surface with cement/bentonite grout. <br /> • The wells are secured in an aboveground or underground locking stovepipe. The well heads <br /> may be enclosed in a water tight cement utility box set flush to the ground surface when <br /> located in a traffic area. <br /> B-3.2 Monitoring Well Development <br /> The wells are developed to reduce the effects of drilling on the formation and to increase the <br /> effective hydraulic radius of the wells. <br /> Monitoring wells are generally developed 24 to 48 hours after installation to allow the grout to <br /> set. Each well is first sampled with a clear disposable bailer to visually inspect for a hydrocarbon <br /> layer or sheen. If no product layer or sheen is observed on the water, the well is developed by <br /> surging, pumping or bailing. Surging along the screened interval of the well is performed to <br /> draw the sediment from the formation into the filter pack and the well, and to set the sand pack. <br /> Development continues until the discharge runs relatively clear of fines. Approximately 5 to 10 <br /> well volumes are generally removed from each monitoring well. Discharge water is stored in 55- <br /> gallon drums and left on site for later discharge or disposal by the client, depending on laboratory <br /> results. The drums are labeled with the date, well number, and a contact person and phone <br /> number. <br /> 20-3712-08.E02/2018R1090 Page B-5 <br /> © 1998,Kleinfelder,Inc. Decerri-cr 23, 1998 <br />
The URL can be used to link to this page
Your browser does not support the video tag.