My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOOPER
>
23
>
2900 - Site Mitigation Program
>
PR0538761
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2020 7:08:19 PM
Creation date
2/21/2020 4:48:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0538761
PE
2950
FACILITY_ID
FA0022259
FACILITY_NAME
PORT OF STOCKTON, ROUGH & READY
STREET_NUMBER
23
STREET_NAME
HOOPER
STREET_TYPE
DR
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
01
SITE_LOCATION
23 HOOPER DR
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINAL SITE 47 SOIL SAMPLING WORK PLAN <br /> PORT OF STOCKTON-ROUGH AND READY ISLAND,CALIFORNIA <br /> Table of Contents <br /> SECTION PAGE <br /> 1. INTRODUCTION......................................................................................................1 <br /> 2. BACKGROUND.........................................................................................................1 <br /> 2.1 Regional Setting.................................................................................................................1 <br /> 2.2 Description of Site 47........................................................................................................2 <br /> 2.2.1 Site Lithology and Hydrogeology......................................................................................2 <br /> 2.2.2 Environmental Conditions and Chemicals of Concern...................................................2 <br /> 3. PROJECT DESCRIPTION........................................................................................3 <br /> 3.1 Task 1: Permitting, Utility Clearance, and Health and Safety Plan...........................3 <br /> 3.2 Task 2: Soil Sampling........................................................................................................3 <br /> 3.3 Task 3: Grab Ground Water Sampling...........................................................................4 <br /> 4. REPORT.......................................................................................................................4 <br /> 5. REFERENCES .............................................................................................................5 <br /> FIGURES <br /> Figure 1. Location of Rough and Ready Island <br /> Figure 2. Proposed Soil Borings, Site 47 <br /> March 2015 i Environmental Risk Services F—,r c, <br /> Corporation '�— 6 -- <br />
The URL can be used to link to this page
Your browser does not support the video tag.