My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOOPER
>
23
>
2900 - Site Mitigation Program
>
PR0538761
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2020 7:08:19 PM
Creation date
2/21/2020 4:48:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0538761
PE
2950
FACILITY_ID
FA0022259
FACILITY_NAME
PORT OF STOCKTON, ROUGH & READY
STREET_NUMBER
23
STREET_NAME
HOOPER
STREET_TYPE
DR
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
01
SITE_LOCATION
23 HOOPER DR
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINAL SITE 47 SOIL SAMPLING WORK PLAN <br /> PORT OF STOCKTON-ROUGH AND READY ISLAND,CALIFORNIA <br /> 3.3 TASK 3: GRAB GROUND WATER SAMPLING <br /> At three locations, the boring will not be terminated when saturated soil is first encountered, <br /> but will be advanced an additional three to four feet to allow a grab ground water sample to be <br /> collected. Two of the three locations will be borings S47-B1 and S47-1310, at each end of the <br /> proposed rail alignment, and the third grab ground water sample will be collected from boring <br /> S47-136, near the center of the alignment. The grab ground water samples will be analyzed for <br /> dissolved arsenic by EPA Method 6020. <br /> 4. REPORT <br /> The results of this investigation will be used to guide soil grading and amendment operations <br /> that are necessary for the construction of the proposed rail facility. The intent is to prevent soil <br /> that exceeds the background concentration of 30 mg/kg (DTSC, 2015) from being entombed <br /> beneath the newly-constructed rail. Greater definition of the distribution of arsenic in the area <br /> will identify areas where more or less soil is required to be removed in order to meet this goal. <br /> The results of the sampling and analyses proposed in this Work Plan will be described in a <br /> technical memorandum prepared within 30 days of receipt of the laboratory data. <br /> March 2015 4 Environmental Risk Services �` <br /> Corporation .e. <br />
The URL can be used to link to this page
Your browser does not support the video tag.