Laserfiche WebLink
FINAL SITE 47 SOIL SAMPLING WORK PLAN <br /> PORT OF STOCKTON-ROUGH AND READY ISLAND,CALIFORNIA <br /> 5. REFERENCES <br /> DTSC, 2015. Technical Memorandum re: "Final Technical Memorandum, Background Metal <br /> Concentrations and Ambient Pesticide Concentrations in Soil, NCS Stockton. October 1997. Prepared by <br /> PRC Environmental Management, Inc. Rancho Cordova, California." Prepared by Edward A. <br /> Fendick,Ph.D.,California Department of Toxic Substances Control,Ecological Risk Assessment <br /> Section,Human and Ecological Risk Office,Sacramento,California. <br /> ERS, 2014. Revised Draft Soil Management Plan CWR Car Storage Yard, Port of Stockton West <br /> Complex,Rough and Ready Island, Stockton, CA. <br /> March 2015 5 Environmental Risk Services P r c . <br /> Corporation J <br />