Laserfiche WebLink
Limited Soil Sampling Work Plan 0 <br /> 1080 Wildlife Avenue C�) <br /> Stockton,California a ntea g ro u p <br /> Antea Group Project No.UPR8298B <br /> 3.2 Soil Boring Activities <br /> Antea Group will advance up to 27 soil borings on the subject property to assess potential impacts at locations <br /> where soil will be disturbed during site improvements. Proposed sampling locations are shown on Figure 2 and are <br /> subject to change pending results of the utility survey, access, and the presence of subsurface utilities or other <br /> obstructions. Antea Group will provide oversight and soil sample collection while our licensed subcontractor uses <br /> a hand auger or direct-push rig (Geoprobe® or equivalent) to advance proposed borings to depths ranging from <br /> approximately two to seven feet below ground surface (bgs). The anticipated maximum depth at certain boring <br /> locations may change depending on the site features and field observations. Field personnel will collect soil <br /> samples in stainless steel or bras soil liners,or laboratory-supplied glass jars and place them in an ice-cooled chest. <br /> Following sample collection,Antea Group field personnel will submit the samples to a state-certified laboratory for <br /> analysis of one or more of the following contaminants of concern,based on the sample location: <br /> • Volatile organic compounds(VOCs)by Environmental Protection Agency(EPA)Method 82606; <br /> • Poly-chlorinated biphenyls by EPA Method 8082; <br /> • CAM 17 metals(antimony,arsenic,barium,beryllium,cadmium,chromium,cobalt,copper,lead,mercury, <br /> molybdenum,nickel,selenium,silver,thallium,vanadium,&zinc)by EPA Method 60106/7400,and; <br /> • Pesticides by EPA Method 8081. <br /> Following soil sample collection, the licensed driller will backfill each boring location using neat cement grout, <br /> capping each location with material to match the surrounding ground surface. <br /> 3.3 Investigative-Derived Waste <br /> The licensed driller will store all soil cuttings and decontamination water generated during the investigation <br /> activities in Department of Transportation (DOT)approved 55-gallon drums,in accordance with the corresponding <br /> DOT protocols for non-hazardous waste. The Port of Stockton is considered the generator of all investigative- <br /> derived waste and will therefore characterize and dispose of the material. <br /> 3.4 Reporting <br /> Upon approval of this Limited Soil Sampling Work Plan, Antea Group will complete pre-field activities, including <br /> permitting,access,and scheduling the field sampling event. Antea Group anticipates the utility clearance will take <br /> one day, followed by the soil sampling (two to three days), which will commence a minimum 48 hours after <br /> contacting USA North for utility clearance. After receipt of the soil analytical data, Antea Group will submit a <br /> report summarizing the field activities and results. A California Professional Geologist will oversee the activities <br /> outlined in this work plan and will oversee the preparation of associated technical reports. <br /> 3 www.anteagroup.com <br />