My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
0
>
2900 - Site Mitigation Program
>
PR0506794
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2020 10:48:29 AM
Creation date
2/25/2020 9:33:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0506794
PE
2950
FACILITY_ID
FA0007632
FACILITY_NAME
POMBO FAMILY ACCOUNT
STREET_NUMBER
0
Direction
W
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
W JOE POMBO PKWY
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FLUOR DANIEL GTI <br /> TASK 2: SOIL BORINGS/SOIL BORING SAMPLING <br /> Fluor Daniel GTI will drill four on-site soil borings at the locations shown on Figure 2 using direct push <br /> technology(DPT)drilling techniques. The borings will be drilled to approximately 5 feet below first <br /> encountered groundwater. Groundwater at the site is expected to be encountered approximately 8 to 10 <br /> feet below ground surface (BGS). The locations of these borings may be adjusted due to unforeseen <br /> subsurface structures and utilities. <br /> Soil samples will be collected at 5-foot intervals from each soil boring beginning at 5 feet BGS using hollow <br /> 2-foot-long by 1.5-inch-outside diameter(O.D.) stainless-steel drive casing lined with brass tube sample <br /> inserts. The sampling equipment will be cleaned between each sampling interval. Each soil sample will be <br /> screened for hydrocarbon vapors using a photoionization detector(PID). Soils encountered during drilling <br /> will be logged using the Unified Soil Classification System by a Fluor Daniel GTI field geologist,working <br /> under the supervision of a California registered geologist. One sample tube from each sampling interval <br /> will be sealed with teflon sheets, capped,taped, labeled, and placed on ice in an insulated container. The <br /> samples will be analyzed by a State-certified analytical laboratory(NEI/GTEL in Wichita, Kansas) for <br /> benzene,toluene, ethylbenzene and xylenes (BTEX), methyl-tert-butyl-ether (MTBE), and total petroleum <br /> hydrocarbons-as-gasoline (TPH-G) by Environmental Protection Agency methods 5030/8020/8015 <br /> modified. If MTBE is detected by EPA method 8020, its presence will be confirmed using EPA method <br /> 8260. An additional soil sample from one of the four soil borings will be analyzed for Polynuclear Aromatic <br /> Hydrocarbons (PAH), Priority Pollutant Metals, and Pesticides by EPA methods 8310, 6010/7000, and <br /> 8080, respectively. <br /> TASK 3: GROUNDWATER SAMPLING <br /> Following installation of the soil borings and extraction of the geoprobe sampling rods, a temporary well <br /> casing constructed of 1-inch-diameter slotted PVC casing will be installed in each boring. Groundwater will <br /> be allowed to accumulate in the casing and grab water samples will be collected at each location in <br /> 40-milliliter vials and 1-liter ambler and plastic bottles. The samples will analyzed for BTEX, MTBE, and <br /> TPH-G by EPA method 8020/8015 modified. If MTBE is detected by EPA method 8020, its presence will <br /> be confirmed using EPA method 8260. In addition, one groundwater sample from one of the four soil <br /> borings will be analyzed for PAH, Priority Pollutant Metals, and Pesticides by EPA methods 610, <br /> 6010/7000, and 8080, respectively. Following completion of groundwater sampling, the casing will be <br /> removed and each soil boring will be grouted to the surface with neat cement. <br /> 0544ases.wkp(Sthl-) <br /> Work Plan for Environmental Site Assessment July 18, 1997 <br /> The Southland Corporation,Southwest corner of Grant Line Road and Pombo Drive,Tracy,CA 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.