Laserfiche WebLink
parking spaces are required for each phase of the project . These parking spaces ( s ) <br /> shall be located as close as possible to the primary entrance to the building . <br /> 14 ) This project will be required to comply with the Model Water Efficient Landscape <br /> Ordinance requirements of the California Code of Regulations , Title 22 , Division 2 , <br /> Chapter 2 . 7 . <br /> p . FIRE CODE REQUIREMENTS : The following California Fire Code ( CFC ) requirements <br /> will be applicable to the proposed - project . The following conditions shall be addressed <br /> prior to submittal of a building permit application to the Building Inspections Division . <br /> 1 ) CFC 507 Fire Protection Water Supply - Fire flow and hydrants shall be provided for <br /> the proposed project by the use of: CFC Appendix -B . <br /> 2 ) If Fire Protection Systems are required they shall be installed according to the CFC , <br /> Chapter 9 and the appropriate standards and guides adopted in Chapter 35 of the <br /> California Building Code and the California Electrical Code . <br /> 3 ) CFC , Section 503 Fire Apparatus Access Roads - Shail be _ provided as required by <br /> this section . 503 . 1 R2 - A secondary access may be required, <br /> 4 ) CFC , Section 906 Portable Fire Extinguishers - Provide .p-ortable fire extinguishers are <br /> required by this section . <br /> 5 ) CFC Section 506 Key Box - A Knox Box shall be installed according to the local fire <br /> department ' s instructions . Make application for the key box at the fire district having <br /> V <br /> urisdiction of this project . If there is an electronically controlled access gate at this site <br /> a Knox key switch will also be required . <br /> 6 ) CF-C , Section 5001 . 3 . 3 . 1 Properties of Hazardous Materials - A complete list of <br /> hazardous materials used and or stored at this site shall be p-rovided . <br /> 7 ) A complete review , at building permit submittal , will require compliance with applicable <br /> codes and ordinances . <br /> 8 ) CFC , Section 105 Permits : Operations Permit( s ) may be required prior to occupancy . <br /> 2 . DEPARTMENT OF PUBLIC WORKS ( Staff contact : Alex Chetley , [209 ] 46 - 3023) <br /> a . All vehicular parking related to applicant ' s proposed -development shall be -onsite at all <br /> times . Parking in the County right- of-way for all winery related events shall be prohibited . <br /> It is the responsibility of the applicant to monitor Acampo Road to ensure compliance with <br /> this requirement . <br /> b . The Traffic Impact Mitigation Fee shall be required for any incremental traffic resulting <br /> from this application . The fee is due and payable at the time of building permit application . <br /> The fee will be based on the current schedule at the time of payment . The fee shall be <br /> automatically adjusted July 1 of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record . ( Resolutions R- 00433 ) <br /> PA- 1700196 — Updated Conditions of Approval 6 <br />