Laserfiche WebLink
Pg�rh. APPLICATION - QUARRY EXCAVATION <br /> • �O.�.CQG <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> FILE NUMBER: QX- <br /> Q�rFORF_ � <br /> RECLAMATION PLAN <br /> CHECKLIST-CONTINUED <br /> I. Ore Processing: <br /> [X] 1. Describe the proposed method and equipment for processing ore(e.g.,dry screening,flotation,leaching,etc.). <br /> [X] 2. Estimate minimum and maximum capacity(input and output)of the mill/processing facility. <br /> [X] 3. Provide the estimated life of the processing operation (if different from mine life). <br /> J. In-stream Mining: <br /> [ ] 1. Describe methods that will be used to protect water quality. <br /> [ ] 2. Describe precautions that will be taken to protect existing riparian vegetation. <br /> [ ] 3. Describe aquatic flora and fauna native to the are to be mined. <br /> [ ] 4. Provide evidence of contact with the State Department of Fish and Game regarding the need for a Stream Alteration <br /> Permit. <br /> [ ] K. Other Information: Include any other information requested by the lead agency to assess the environmental impacts of <br /> the proposed operation. <br /> III. DESCRIPTION OF PROPOSED RECLAMATION <br /> A. Subsequent Use(s): <br /> [X] 1. What is the proposed subsequent use for the reclaimed mined land (e.g., recreation,wildlife habitat,grazing,open <br /> space, etc.) <br /> [X] 2. Evidence that owner(s)of a possessory interest(including surface rights)have been notified of the proposed use or <br /> potential uses after reclamation. <br /> [ ] 3. If the proposed end use is for a public purpose(e.g.,stormwater retention basin, ground water recharge basin, etc.), <br /> provide evidence that a public agency agrees to the need for the project and will assume responsibility for it upon <br /> completion. If a commitment cannot be obtained from a public agency,identify an alternative use and provide a <br /> plan for reclaiming the site for the alternate use. <br /> B. Reclamation Schedule: <br /> [X] 1. Provide a time schedule that will ensure reclamation at the earliest possible time on those portions of the mined <br /> lands that will not be subject to further disturbance. <br /> [X] 2. Provide a map of the proposed phases of reclamation and the corresponding acreage and dates for completion of <br /> each phase(see Reclamation Site Plan). <br /> [X] 3. If reclamation will not be concurrent with mining,explain why. <br /> C. Post Mining Topography: <br /> [X] 1. Provide a map of proposed post-reclamation topography;show drainage plan, benches, roads, plantings,and other <br /> pertinent features of the reclamation (see Reclamation Site Plan). <br /> IN 2. Attach cross sections through slopes,cuts,and fills;show original ground,post-mining surface, underlying geologic <br /> conditions,and reclaimed surface(see Reclamation Site Plan). <br /> F:\DEVSVC\Planning Application Forms\ Page 11 of 19 <br /> Quarry Excavation.doc.(Revised 02-03-10) <br />