Laserfiche WebLink
PO•U l ry <br /> C,° APPLICATION - QUARRY EXCAVATION <br /> SAN JOAQUIN COUNTY COMMUNITY <br /> DEVELOPMENT DEPARTMENT <br /> FILE NUMBER: QX- <br /> RECLAMATION PLAN <br /> CHECKLIST-CONTINUED <br /> [X] 3. Describe how slopes will be stabilized to prevent failures/landslides, earth flows,falling rock, and erosion. <br /> 11 4. Specify slope design calculations including the factor of safety. <br /> I I D. Impoundments: Describe how impoundments will be reclaimed (e.g., regraded, dewatered, capped, revegetated, <br /> removed, etc.). <br /> IXI E. Drainage: Describe provisions for natural drainage and how erosion of disturbed land and sedimentation will be <br /> controlled during excavation and after final reclamation (e.g., revegetation, rip rap,sedimentation basins, berms,ditches, <br /> water bars, silt screens regrading, etc.). <br /> 1X] F. Disposition of Old Equipment: Discuss the disposition of equipment, buildings,structures, etc. <br /> G. Revegetation: <br /> [X] 1. Explain topsoil(or soil substitute)redistribution methods, including volumes of materials to be redistributed, <br /> equipment and methods for transport, methods for preventing over compaction,and schedule for replacement. The <br /> explanation may include: <br /> 1 a. the average thickness of replaced topsoil on the mine site; <br /> � ) b. tests that will be run to determine whether soil or mine wastes need soil amendments to promote the support <br /> plant growth' <br /> � ) <br /> C. methods to be used to protect redistributed topsoil (or soil substitute)from wind and water erosion before and <br /> after seeding and planting. <br /> L l 2. Explain the types and amounts of fertilizers, mulch, soil stabilizers, lime,or other materials that will be used in <br /> revegetation and indicate when they will be applied. <br /> l 3. Provide a planting (landscape)plan. The plan may include: <br /> l a. how the site will be prepared for planting (e.g., ripping, disking, and incorporation of soil additives), <br /> l b. a list of the species (include scientific names)to be planted, <br /> c. the type of plant material to be used (e.g.,seeds, cuttings,container, plugs), <br /> l d. the density or rate of planting (e.g_, pounds/acre,cuttings on 5 foot centers,etc.), <br /> l e. a revegetation map indicating species and location. <br /> L ] 4. Describe what planting method(s)will be used (e.g., hydroseeding, hand planting,seed drill, etc.). <br /> 5. Discuss when(during which month(s))planting will take place and the relationship between timing and the success <br /> of the revegetation plan. <br /> � ) 6. Describe how the plants will be protected from predation and disturbance(e.g.,fencing,signs, etc.). <br /> 7. Irrigation: If irrigation is proposed,then discuss: <br /> l a. the kind of irrigation system that will be used to water the plants; <br /> 1 b. the water source and the water quality of that source; <br /> DEVSVC\Planning Application Forms\ Page 12 of 19 <br /> arry Excavation.doc.(Revised 02-03-10) <br />