ABBREVIATIONS
<br />&
<br />AND
<br />I.D.
<br />INSIDE DIAMETER
<br />L
<br />ANGLE
<br />INSUL.
<br />INSULATION
<br />@
<br />AT
<br />INT.
<br />INTERIOR
<br />q
<br />CENTERLINE
<br />JT,
<br />JOINT
<br />0
<br />DIAMETER OF ROUND
<br />KIT.
<br />KITCHEN
<br />#
<br />POUND OR NUMBER
<br />LAM.
<br />LAMINATE
<br />(E)
<br />EXISTING
<br />LAV.
<br />LAVATORY
<br />(R)
<br />RELOCATED
<br />LT.
<br />LIGHT
<br />PER CPC 422.1
<br />CIVIL - NOTES AND DETAILS
<br />L.E.D.
<br />LIGHT EMITTING DIODE
<br />(N)
<br />NEW
<br />MAX.
<br />MAXIMUM
<br />A.F.F.
<br />ABOVE FINISH FLOOR
<br />M.C.
<br />MEDICINE CABINET
<br />A.D.
<br />AREA DRAIN
<br />MECH.
<br />MECHANICAL
<br />ADJ.
<br />ADJUSTABLE
<br />MEMB.
<br />MEMBRANE
<br />AGGR.
<br />AGGREGATE
<br />MTL.
<br />METAL
<br />AL.
<br />ALUMINUM
<br />MFR.
<br />MANUFACTURER
<br />APPROX.
<br />APPROXIMATE
<br />MIN.
<br />MINIMUM
<br />ARCH.
<br />ARCHITECTURAL
<br />MIR.
<br />MIRROR
<br />ASB.
<br />ASBESTOS
<br />MISC.
<br />MISCELLANEOUS
<br />ASPH.
<br />ASPHALT
<br />M.O.
<br />MASONRY OPENING
<br />BD.
<br />BOARD
<br />MTD-
<br />MOUNTED
<br />BITUM.
<br />BITUMINOUS
<br />MUL,
<br />MULLION
<br />BLDG.
<br />BUILDING
<br />N.
<br />NORTH
<br />BLKG.
<br />BLOCKING
<br />N.I.C.
<br />NOT IN CONTRACT
<br />BM
<br />BEAM
<br />NO. OR
<br />NUMBER
<br />BOT.
<br />BOTTOM
<br />NOM.
<br />NOMINAL
<br />CAB
<br />CABINET
<br />N.T.S.
<br />NOT TO SCALE
<br />CEM.
<br />CEMENT
<br />O.A.
<br />OVERALL
<br />CER.
<br />CERAMIC
<br />OBS.
<br />OBSCURE
<br />C. 1.
<br />CAST IRON
<br />O.C.
<br />ON CENTER
<br />CLG.
<br />CEILING
<br />O.D.
<br />OUTSIDE DIAMETER
<br />CLKG.
<br />CAULKING
<br />OFF.
<br />OFFICE
<br />CLO.
<br />CLOSET
<br />OPNG,
<br />OPENING
<br />CLR./CL,
<br />CLEAR
<br />OPP.
<br />OPPOSITE
<br />C.O.
<br />CASED OPENING
<br />PL.
<br />PLATE
<br />COL.
<br />COLUMN
<br />P.LAM.
<br />PLASTIC LAMINATE
<br />CONC,
<br />CONCRETE
<br />PLAS.
<br />PLASTER
<br />CONN.
<br />CONNECTION
<br />PLYWD.
<br />PLYWOOD
<br />CONSTR.
<br />CONSTRUCTION
<br />PR.
<br />PAIR
<br />CONT.
<br />CONTINUOUS
<br />PT.
<br />POINT
<br />CTSK.
<br />COUNTERSUNK
<br />PTN.
<br />PARTITION
<br />CNTR.
<br />COUNTER
<br />Q.T.
<br />QUARRY TILE
<br />CTR.
<br />CENTER
<br />QSR
<br />QUICK SERVE RESTAURANT
<br />DBL
<br />DOUBLE
<br />R OR RAD.
<br />RADIUS
<br />DEPT.
<br />DEPARTMENT
<br />R.D.
<br />ROOF DRAIN
<br />DET.
<br />DETAIL
<br />REF,
<br />REFERENCE
<br />DIA.
<br />DIAMETER
<br />REFR.
<br />REFRIGERATOR
<br />DIM,
<br />DIMENSION
<br />RGTR.
<br />REGISTER
<br />DISP.
<br />DISPENSER
<br />REINF.
<br />REINFORCED
<br />DN.
<br />DOWN
<br />REQ'D
<br />REQUIRED
<br />D.O.
<br />DOOR OPENING
<br />RESIL.
<br />RESILIENT
<br />DR.
<br />DOOR
<br />RM.
<br />ROOM
<br />DWR.
<br />DRAWER
<br />R.O.
<br />ROUGH OPENING
<br />D.S.
<br />DOWNSPOUT
<br />R.W,L.
<br />RAIN WATER LEADER
<br />DWG.
<br />DRAWING
<br />S.
<br />SOUTH
<br />E
<br />EAST
<br />S.C.
<br />SOLID CORE
<br />EA
<br />EACH
<br />SCHED.
<br />SCHEDULE
<br />E.J.
<br />EXPANSION JOINT
<br />S.D.
<br />SOAP DISPENSER
<br />EL.
<br />ELEVATION
<br />SECT.
<br />SECTION
<br />ELEC.
<br />ELECTRICAL
<br />SH.
<br />SHELF
<br />E.P.
<br />ELECTRICAL PANELBOARD
<br />SHR,
<br />SHOWER
<br />EQ
<br />EQUAL
<br />SHT.
<br />SHEET
<br />EQPT.
<br />EQUIPMENT
<br />SIM.
<br />SIMILAR
<br />EXST.
<br />EXISTING
<br />SPEC.
<br />SPECIFICATION
<br />EXP.
<br />EXPANSION
<br />SQ.
<br />SQUARE
<br />EXT.
<br />EXTERIOR
<br />S.S.
<br />STAINLESS STEEL
<br />F.E.
<br />FIRE EXTINGUISHER
<br />STD.
<br />STANDARD
<br />F.F.
<br />FLOOR FINISH
<br />STL.
<br />STEEL
<br />FDN.
<br />FOUNDATION
<br />STOR•
<br />STORAGE
<br />FIN.
<br />FINISH
<br />STRL.
<br />STRUCTURAL
<br />FL.
<br />FLOOR
<br />SYM.
<br />SYMMETRICAL
<br />FLASH'G
<br />FLASHING
<br />T.B.S.
<br />TO BE SPECIFIED
<br />FLUOR.
<br />FLUORESCENT
<br />TRD
<br />TREAD
<br />F.O.C.
<br />FACE OF CONCRETE
<br />T.B.
<br />TOWEL BAR
<br />F.O.F.
<br />FACE OF FINISH
<br />T.C.
<br />TOP OF CURB
<br />F.O.S.
<br />FACE OF STUD
<br />TEL.
<br />TELEPHONE
<br />FPRF.
<br />FIREPROOF
<br />TER.
<br />TERRAllO
<br />F.S.
<br />FLOOR SINK
<br />T&G
<br />TONGUE & GROOVE
<br />FT.
<br />FOOT OR FEET
<br />THK.
<br />THICK
<br />FTG.
<br />FOOTING
<br />T. P.
<br />TOP OF PAVEMENT
<br />FURR.
<br />FURRING
<br />T.P.D.
<br />TOILET PAPER DISPENSER
<br />FUT.
<br />FUTURE
<br />T.V.
<br />TELEVISION
<br />G.A.
<br />GAUGE
<br />T.W.
<br />TOP OF WALL
<br />GALV.
<br />GALVANIZED
<br />TYP,
<br />TYPICAL
<br />GL.
<br />GLASS
<br />UNF.
<br />UNFINISHED
<br />GR.
<br />GRADE
<br />U.N.O.
<br />UNLESS NOTED OTHERWISE
<br />GSM
<br />GALVANIZED SHEET METAL
<br />VERT.
<br />VERTICAL
<br />GYP.
<br />GYPSUM
<br />V.C.T.
<br />VINYL COMPOSITE TILE
<br />G.W.B.
<br />GYPSUM WALL BOARD
<br />W.
<br />WEST
<br />H.B.
<br />HOSE BIBB
<br />W/
<br />WITH
<br />H.C.
<br />HOLLOW CORE
<br />WB.
<br />WALL BASE
<br />HDWD.
<br />HARDWOOD
<br />W.C.
<br />WATER CLOSET
<br />HDWE,
<br />HARDWARE
<br />WD.
<br />WOOD
<br />H.M.
<br />HOLLOW METAL
<br />W/0
<br />WITHOUT
<br />HORIZ.
<br />HORIZONTAL
<br />HR.
<br />HOUR
<br />WP.
<br />WATERPROOF
<br />HT.
<br />HEIGHT
<br />WSCT.
<br />WAINSCOT
<br />WT.
<br />WEIGHT
<br />SYMBOLS
<br />SECTION MARK XX
<br />xx.x
<br />EXTERIOR ELEVATION TAG XX
<br />XX.X
<br />X
<br />ELEVAT ON TAG X XX.X X
<br />X
<br />ELEVATION MARK LOCAT ON
<br />FINISH TAG XX -X
<br />WINDOW TAG OX
<br />DOOR TAG 0
<br />WALL TAG XX
<br />KEYED NOTE XX
<br />ARCO
<br />ARCO AM/PM
<br />NWC CHEROKEE RD
<br />@ NEWTON RD
<br />STOCKTON, CALIFORNIA
<br />GENERAL PROJECT NOTES
<br />1. ALL CONSTRUCTION SHALL COMPLY WITH APPLICABLE BUILDING CODES AND LOCAL
<br />RESTRICTIONS. CONTRACTORS MUST COMPLY WITH CONTRACTOR REGISTRATION
<br />REQUIREMENTS OF ALL GOVERNING AUTHORITIES. THE GENERAL BUILDING PERMITS
<br />SHALL BE PAID FOR BY THE OWNER UNLESS AGREED OTHERWISE. ALL OTHER PERMITS
<br />SHALL BE SECURED AND PAID FOR BY THE SUBCONTRACTOR DIRECTLY RESPONSIBLE.
<br />ALL REQUIRED CITY, COUNTY AND/OR STATE LICENSES SHALL BE ACQUIRED AND PAID
<br />FOR BY THE INDIVIDUAL SUBCONTRACTOR.
<br />2. IT IS THE INTENT OF THE OWNER, THE ARCHITECT AND THEIR CONSULTANTS, THAT
<br />ALL WORK DEPICTED IN THESE DRAWINGS AND SPECIFICATIONS IS TO BE PROVIDED BY
<br />THE GENERAL CONTRACTOR. ANY REFERENCES TO THE CONTRARY THROUGHOUT THE
<br />CONSTRUCTION DOCUMENTS OR SPECIFICATIONS IS NOT INTENDED. ADDITIONALLY,
<br />CONTRACTOR IS TO REFER TO THE BID DOCUMENT PACKET AND/OR OWNER'S SCOPE
<br />OF WORK DOCUMENT(S) WHICH SHALL TAKE PRECEDENCE OVER SCOPE THAT MAY BE
<br />PRESENTED IN THIS SET OF CONSTRUCTION DOCUMENTS OR SPECIFICATIONS. THE
<br />SCOPE OF WORK DOCUMENT IS INTENDED TO IDENTIFY ALL OWNER SUPPLIED ITEMS
<br />OR WORK PROVIDED BY OTHERS. ABSENCE OF THESE DOCUMENTS MEANS ALL WORK
<br />NOTED IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR UNLESS THE OWNER
<br />HAS SPECIFIED OTHERWISE DURING THE BID PROCESS.
<br />3. APPROVED PLANS SHALL BE KEPT IN A PLAN BOX AND SHALL NOT BE USED BY
<br />WORKMEN. ALL CONSTRUCTION SETS SHALL REFLECT SAME INFORMATION AS THE
<br />APPROVED PLANS. CONTRACTOR SHALL MAINTAIN ONE COMPLETE SET OF PLANS ON
<br />THE PREMISES IN GOOD CONDITION AT ALL TIMES. THIS SHALL INCLUDE ALL ADDENDA
<br />AND CHANGE ORDERS.
<br />4. DISCREPANCIES BETWEEN PORTIONS OF THE CONTRACT DOCUMENTS, DRAWINGS AND
<br />SPECIFICATIONS ARE NOT INTENDED. THE CONTRACTOR IS TO CLARIFY ANY SUCH
<br />DISCREPANCIES WITH THE ARCHITECT OR PROJECT MANAGER PRIOR TO COMMENCING
<br />WORK. STATED DIMENSIONS TAKE PRECEDENCE OVER GRAPHICS, DO NOT SCALE
<br />DRAWINGS TO DETERMINE LOCATIONS. THE ARCHITECT OR PROJECT MANAGER SHALL BE
<br />NOTIFIED OF ANY SUCH DISCREPANCIES PRIOR TO CONTINUING WITH WORK.
<br />5. IT IS THE INTENT OF THE ARCHITECT THAT THIS WORK BE IN CONFORMANCE WITH ALL
<br />REQUIREMENTS OF THE BUILDING AUTHORITIES HAVING JURISDICTION OVER THIS TYPE
<br />OF CONSTRUCTION AND OCCUPANCY. THE CONTRACTOR SHALL NOTIFY ARCHITECT
<br />IMMEDIATELY OF CONFLICTS WITH GOVERNING CODE REQUIREMENTS BEFORE
<br />PROCEEDING FURTHER WITH THE AFFECTED WORK.
<br />6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE ALL EXISTING
<br />UTILITIES AND TO PROTECT THEM FROM DAMAGE. CONTRACTOR SHALL BEAR THE
<br />EXPENSE OF REPAIR OR REPLACEMENT OF UTILITIES OR OTHER PROPERTY DAMAGED
<br />BY OPERATIONS IN CONJUNCTION WITH THE EXECUTION OF THE WORK.
<br />7. THE CONTRACTOR TO PROVIDE FIRE SPRINKLER SYSTEM AND ALARM SYSTEM (WHEN
<br />REQUIRED BY CODE AND NOTED AS REQUIRED BY THESE PLANS) IN ACCORDANCE WITH
<br />NFPA REQUIREMENTS. FIRE SPRINKLER CONTRACTOR IS TO SUBMIT COMPLETE SHOP
<br />DRAWINGS, LAYOUT AND RELATED DATA TO BUILDING DEPARTMENT AND FIRE MARSHAL
<br />FOR APPROVAL PRIOR TO INSTALLATION.
<br />8, FOR CONSTRUCTION DETAILS NOT SHOWN, USE THE MANUFACTURER'S APPROVED SHOP
<br />DRAWINGS/DATA SHEETS IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. ALL
<br />DETAILS AND SECTIONS SHOWN ON THE DRAWINGS ARE INTENDED TO BE TYPICAL AND
<br />SHALL BE CONSTRUED TO APPLY TO ANY SIMILAR SITUATION ELSEWHERE IN THE WORK
<br />EXCEPT WHERE A DIFFERENT DETAIL IS SHOWN.
<br />9. THE CONTRACTOR SHALL VERIFY LOCATIONS OF ALL FOOD SERVICE EQUIPMENT AND
<br />COORDINATE LOCATION OF ALL UTILITIES INCLUDING FLOOR SINKS, FLOOR DRAINS,
<br />SLOPES/SLAB DEPRESSIONS AND RAISED CURBS, ELECTRICAL AND PLUMBING AND
<br />STUBOUTS FOR FUTURE EQUIPMENT WHERE NOTED.
<br />10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE SECURITY OF THE SITE
<br />WHILE JOB IS IN PROGRESS AND UNTIL BUILDING IS OCCUPIED.
<br />11. ALL DEBRIS SHALL BE REMOVED FROM PREMISES REGULARLY AND ALL AREAS SHALL
<br />BE LEFT 1N A CLEAN (BROOM) CONDITION AT ALL TIMES.
<br />12. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE SAFETY OF
<br />THE OCCUPANTS AND WORKERS AT ALL TIMES.
<br />13. CONTRACTOR SHALL PROVIDE TEMPORARY WATER, POWER, TELEPHONE, FACSIMILE OR
<br />METHOD TO RECEIVE E-MAIL, PRINTER AND TOILET FACILITIES AS REQUIRED.
<br />14. GENERAL CONTRACTOR IS RESPONSIBLE FOR RECEIVING, UNLOADING, UN -CRATING,
<br />INSTALLATION AND HOOKUP OF ALL FOOD SERVICE EQUIPMENT AND OTHER OWNER OR
<br />VENDOR FURNISHED ITEMS.
<br />15. GENERAL CONTRACTOR IS REQUIRED TO LABEL ALL ELECTRICAL PANELS, PLUMBING
<br />VALVES, AND ROOF TOP EQUIPMENT WITH PLASTIC PHENOLIC ENGRAVED PLATES
<br />ATTACHED TO IDENTIFY THE EQUIPMENT USE OR PURPOSE.
<br />16. CONTRACTOR SHALL SUPPLY, LOCATE AND BUILD INTO THE WORK ALL INSERTS,
<br />ANCHORS, ANGLES, PLATES, OPENINGS, SLEEVES, HANGERS, SLAB DEPRESSIONS AND
<br />PITCHES AS MAY BE REQUIRED TO ATTACH AND ACCOMMODATE OTHER WORK, SPECIAL
<br />INSPECTION REQUIREMENTS MAY APPLY TO ALL STRUCTURAL EMBEDMENTS OR POST
<br />INSTALLED ANCHORS. CONTRACTOR SHALL CONFIRM REQUIREMENTS PRIOR TO
<br />INSTALLATION.
<br />17. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO DETERMINE MEANS AND METHODS
<br />FOR ERECTION PROCEDURE AND SEQUENCE OF THE CONSTRUCTION. CONTRACTOR TO
<br />INSURE THE SAFETY OF ALL INSTALLED IMPROVEMENTS, BUILDINGS AND THEIR
<br />COMPONENT PARTS DURING ERECTION.
<br />18, MATERIALS LISTED IN DRAWINGS ARE BASED ON DESIGN INTENT. ALTERNATE
<br />SPECIFICATIONS MAY BE ACCEPTED PROVIDED THEY CLOSELY MATCH AND ARE DEEMED
<br />EQUAL TO SPECIFIED MATERIAL. GENERAL CONTRACTOR IS TO SUBMIT PROPOSED
<br />SAMPLES OF SUBSTITUTIONS, ALONG WITH SAMPLE OF THAT SPECIFIED IN DRAWINGS
<br />FOR REVIEW BY THE ARCHITECT OR PROJECT MANAGER. SUBSTITUTIONS WILL ONLY BE
<br />APPROVED IF SPECIFIED MATERIAL IS PROVEN TO BE UNAVAILABLE WITHIN A
<br />REASONABLE TIME FRAME OR THE SUBSTITUTION IS A BENEFIT TO THE OWNER RELATED
<br />TO COST OR SCHEDULE TIME SAVINGS.
<br />19. THE PROJECT BOUNDARIES SHALL BE CONFIRMED BY THE CONTRACTOR PRIOR TO
<br />CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE OWNERS ATTENTION
<br />IMMEDIATELY BEFORE PROCEEDING WITH CONSTRUCTION.
<br />20. ALL LABOR, MATERIALS AND INSTALLATIONS MUST COMPLY WITH THE CODES AND
<br />REGULATIONS OF ALL AUTHORITIES HAVING JURISDICTION. ANY DISCREPANCY WHICH
<br />EXISTS BETWEEN THE REQUIREMENTS BY THE PLANS, SPECIFICATIONS, SAID CODES,
<br />RULES AND REGULATIONS, SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF
<br />THE ARCHITECT, IN WRITING FOR RESOLUTION. IF ANY CHANGE IN THE PLANS AND /
<br />OR SPECIFICATIONS OCCURS AS A RESULT OF THE REQUIREMENTS OF THE LIFE
<br />SAFETY CODE (NFPA 101) OR ANY OTHER AUTHORITIES HAVING JURISDICTION AFTER
<br />THE SUBMISSION OF BIDS, THEN THE BIDDERS WILL BE GIVEN THE OPPORTUNITY TO
<br />ADJUST THEIR BIDS, IF NECESSARY, ONLY FOR THE CHANGE.
<br />21. THE CONTRACTOR SHALL COORDINATE THE WORK WITH MECHANICAL, ELECTRICAL AND
<br />PLUMBING DRAWINGS FOR ALL NECESSARY OPENINGS AND PENETRATIONS THROUGH
<br />WALLS, CEILING AND FLOORS.
<br />22. ALL EXPOSED PIPES, CONDUITS OR DUCTS IN FINISHES AREAS, WHETHER SHOWN ON
<br />DRAWINGS OR NOT, SHALL BE FURRED OUT WITH GYPSUM BOARD.
<br />23. LOCATION OF ACCESS DOORS SUPPLIED BY MECHANICAL TRADES AND INSTALLED BY
<br />OTHERS SHALL BE DETERMINED IN THE FIELD THROUGH COORDINATION OF TRADES,
<br />LOCATION OF LIGHT FIXTURES SHALL GOVERN POSITION OF DUCTS AND PIPES FOR
<br />WHICH ACCESS DOORS ARE REQUIRED. ACCESS DOORS SHALL NOT BE PLACED IN
<br />INACCESSIBLE POSITIONS OR IN THE WAY OF LIGHTS, GRILLS, REGISTERS, CONCEALED
<br />BY CASEWORK, ECT.
<br />PROJECT DATA
<br />APN: 132-060-10
<br />ZONING:
<br />I -L- INDUSTRIAL
<br />PROJECT ADDRESS:
<br />CHEROKEE RD 0 NEWTON RD (SEC), STOCKTON, CA 95205
<br />PARCEL SIZE- 2.88 ACRES
<br />SETBACKS PER I -L ZONING:
<br />FRONT YARD: 30' MIN
<br />SIDE YARD -STREET SIDE: 20' MIN
<br />SIDE YARD -INTERIOR: NONE
<br />BUILDING HEIGHT: MAX 45'
<br />PERMITTED USE: GASOLINE FILLING STATION, RETAIL FOOD SHOP
<br />am/Dm STORE
<br />CONSTRUCTION TYPE: V -B
<br />USE GROUP: M (CONVENIENCE STORE)
<br />ALLOWABLE AREA: 9,000 S.F.
<br />ACTUAL GROSS AREA: 3,446 S.F.
<br />PER FIRE PREVENTION BUREAU OF SAN JOAQUIN COUNTY:
<br />C -STORE LESS THAN 12,000 S.F.- FIRE SPRINKLERS NOT
<br />REQUIRED
<br />CANOPY
<br />CONSTRUCTION TYPE: Il -B
<br />USE GROUP: M (FUEL CANOPY)
<br />ALLOWABLE AREA: 12,500 S.F.
<br />ACTUAL GROSS AREA: 6,050 S.F.
<br />PER FIRE PREVENTION BUREAU OF SAN JOAQUIN COUNTY:
<br />NON-COMBUSTIBLE FUEL ISLAND- FIRE SPRINKLERS NOT REQUIRED
<br />OCCUPANCY AND EGRESS:
<br />CONVENIENCE STORE
<br />SALES - 1,852 S.F. (1852/60) =
<br />31
<br />OFFICE - 380 S.F. (380/100) =
<br />4
<br />RESTROOMS - 190 S.F. (EXEMPT) =
<br />0
<br />PREP/UTILITY - 405 S.F. (405/200) =
<br />3
<br />COOLER/FREEZER - 533 S.F. (533/300) =
<br />2
<br />WALL SPACE - 86 S.F. (EXEMPT) =
<br />0
<br />TOTAL (NET): 3,170 S.F. =
<br />40 OCCUPANTS
<br />TOTAL (GROSS): 3,446 S.F.
<br />FIRE CODE:
<br />EXITS REQUIRED: 1
<br />CALIFORNIA FIRE CODE
<br />EXITS PROVIDED: 3
<br />OF CALIF, AND LOCAL JURISDICTION
<br />PLUMBING FIXTURE COUNT:
<br />CIVIL - EROSION CONTROL NOTES AND DETAILS
<br />CONVENIENCE STORE:
<br />CIVIL - GRADING PLAN
<br />PER CPC TABLE A 422.1
<br />CIVIL - STORM DRAIN PLAN
<br />USE GROUP: M (CONVENIENCE STORE) = 200 OCC
<br />LOAD
<br />ACTUAL GROSS AREA: 3,446 S.F. / 200 = 17.3
<br />USE 18
<br />REQUIRED ALL -GENDER 18 / 2 = 9
<br />CIVIL - NOTES AND DETAILS
<br />PER CPC 422.1
<br />CIVIL - NOTES AND DETAILS
<br />REQUIRED
<br />CIVIL - NOTES AND DETAILS
<br />ALL --GENDER FIXTURES REQ = 1 WATER CLOSET,
<br />1 IAV
<br />PROVIDED
<br />ALL -GENDER FIXTURES = 2 WATER CLOSET, 2 LAV
<br />APPLICABLE CODES
<br />BUILDING CODE : 2016 CALIFORNIA BUILDING CODE
<br />SITE VICINITY MAP
<br />SITE'
<br />PROJECT DIRECTORY
<br />OWNER/ APPLICANT
<br />ADELFOS PARTNERS
<br />13899 DEVRIES ROAD
<br />LODI, CA 95242
<br />CONTACT: RICHARD SARRIS
<br />(714) 672-0800
<br />ARCHITECT, PETROLEUM
<br />BARGHAUSEN CONSULTING ENGINEERS, INC
<br />18215 72ND AVENUE SOUTH
<br />KENT, WA 98032
<br />CONTACT: DAN GOALWIN
<br />(425) 251-6222
<br />CIVIL ENGINEER
<br />BARGHAUSEN CONSULTING ENGINEERS, INC.
<br />18215 72ND AVENUE SOUTH
<br />KENT, WA 98032
<br />CONTACT: PETE BAILEY, P.E.
<br />(425) 251-6222
<br />LANDSCAPE ARCHITECT
<br />BARGHAUSEN CONSULTING ENGINEERS, INC.
<br />18215 72ND AVENUE SOUTH
<br />KENT, WA 98032
<br />CONTACT: JEFF VARLEY
<br />(425) 251-6222
<br />PLUMBING, MECHANICAL. ELECTRICAL ENGINEER
<br />ABOSSEIN ENGINEERING
<br />1844 114th AVENUE NORTHEAST
<br />BELLEVUE, WA 98004
<br />CONTACT: JAY WERNER
<br />(425) 462--9441
<br />GEOTECHNICAL
<br />PARAGON GEOTECHNICAL, INC.
<br />7979 WENTE WAY
<br />SACRAMENTO, CALIFORNIA 95829
<br />(916) 682-0906
<br />SURVEYOR
<br />ZIEBATECH LAND SURVEYING
<br />9925 WINDSOR WAY
<br />SAN RAMON, CA 94583
<br />CONTACT: PIOTR ZIEBA
<br />(925) 551-0108
<br />STRUCTURAL- CANOPY
<br />FREY-MOSS STRUCTURES
<br />100 CELANO CIRCLE
<br />PALM DESERT, CA 92211
<br />CONTACT: LEE DRUMMUND
<br />(760) 564-9400
<br />DEVELOPMENT CONTACTS
<br />BUILDING DEPARTMENT:
<br />SAN JOAQUIN COUNTY
<br />COMMUNITY DEVELOPMENT DEPT,
<br />1810 E. HAZELTON AVE
<br />STOCKTON, CA 95205
<br />(209) 468--3121
<br />HEALTH DEPARTMENT - FOOD:
<br />SAN JOAQUIN ENVIRONMENTAL
<br />HEALTH DEPARTMENT
<br />1868 E HAZELTON AVENUE
<br />STOCKTON, CA 95205
<br />(209) 468-3420
<br />CUPA:
<br />SAN JOAQUIN COUNTY
<br />ENVIRONMENTAL HEALTH DEPT
<br />1868 EAST HAZELTON AVE
<br />STOCKTON, CA 95205
<br />(209) 468-3420
<br />APCD:
<br />SAN JOAQUIN VALLEY
<br />AIR POLLUTION CONTROL DISTRICT
<br />NORTHERN REGION OFFICE
<br />4800 ENTERPRISE WAY
<br />MODESTO, CA 95356
<br />(209) 557-6400
<br />FIRE DEPARTMENT:
<br />SAN JOAQUIN COUNTY
<br />COMMUNITY DEVELOPMENT DEPT
<br />1810 E. HAZELTON AVE
<br />STOCKTON, CA 95205
<br />(209) 468-3121
<br />PUBLIC WORKS:
<br />SAN JOAQUIN COUNTY
<br />PUBLIC WORKS DEPT.
<br />1810 E. HAZELTON AVE
<br />STOCKTON, CA 95205
<br />(209) 468-3000
<br />WATER:
<br />CALIFORNIA WATER SERVICE
<br />1505 EAST SONORA ST
<br />STOCKTON, CA 95205
<br />547-7900
<br />SEWER:
<br />SEPTIC SYSTEM
<br />UTILITIES:
<br />PACIFIC GAS AND ELECTRIC
<br />(PG&E)
<br />(800) 743-5000
<br />DEFERRED SUBMITTALS
<br />-TRUSS SHOP DRAWINGS
<br />-SIGNAGE PERMITS
<br />-SOLAR PANEL/ WIRING/ DESIGN PLANS
<br />SPECIAL INSPECTIONS
<br />-SPECIAL INSPECTIONS: SEE STRUCTURAL SHEET S3.4 FOR REQUIREMENTS
<br />INDEX OF DRAWINGS
<br />** FOOD FACILITIES SUBMITTAL SHEETS
<br />GENERAL
<br />T1.1 ** COVER SHEET
<br />GC -1
<br />2016
<br />CALGREEN CODE
<br />PLUMBING CODE:
<br />2016
<br />CALIFORNIA PLUMBING CODE
<br />ELECTRICAL CODE:
<br />2016
<br />CALIFORNIA ELECTRICAL CODE
<br />MECHANICAL CODE:
<br />2016
<br />CALIFORNIA MECHANICAL CODE
<br />ENERGY CODE:
<br />2016
<br />CA ENERGY STANDARDS
<br />FIRE CODE:
<br />2016
<br />CALIFORNIA FIRE CODE
<br />AS AMENDED BY STATE
<br />OF CALIF, AND LOCAL JURISDICTION
<br />SITE VICINITY MAP
<br />SITE'
<br />PROJECT DIRECTORY
<br />OWNER/ APPLICANT
<br />ADELFOS PARTNERS
<br />13899 DEVRIES ROAD
<br />LODI, CA 95242
<br />CONTACT: RICHARD SARRIS
<br />(714) 672-0800
<br />ARCHITECT, PETROLEUM
<br />BARGHAUSEN CONSULTING ENGINEERS, INC
<br />18215 72ND AVENUE SOUTH
<br />KENT, WA 98032
<br />CONTACT: DAN GOALWIN
<br />(425) 251-6222
<br />CIVIL ENGINEER
<br />BARGHAUSEN CONSULTING ENGINEERS, INC.
<br />18215 72ND AVENUE SOUTH
<br />KENT, WA 98032
<br />CONTACT: PETE BAILEY, P.E.
<br />(425) 251-6222
<br />LANDSCAPE ARCHITECT
<br />BARGHAUSEN CONSULTING ENGINEERS, INC.
<br />18215 72ND AVENUE SOUTH
<br />KENT, WA 98032
<br />CONTACT: JEFF VARLEY
<br />(425) 251-6222
<br />PLUMBING, MECHANICAL. ELECTRICAL ENGINEER
<br />ABOSSEIN ENGINEERING
<br />1844 114th AVENUE NORTHEAST
<br />BELLEVUE, WA 98004
<br />CONTACT: JAY WERNER
<br />(425) 462--9441
<br />GEOTECHNICAL
<br />PARAGON GEOTECHNICAL, INC.
<br />7979 WENTE WAY
<br />SACRAMENTO, CALIFORNIA 95829
<br />(916) 682-0906
<br />SURVEYOR
<br />ZIEBATECH LAND SURVEYING
<br />9925 WINDSOR WAY
<br />SAN RAMON, CA 94583
<br />CONTACT: PIOTR ZIEBA
<br />(925) 551-0108
<br />STRUCTURAL- CANOPY
<br />FREY-MOSS STRUCTURES
<br />100 CELANO CIRCLE
<br />PALM DESERT, CA 92211
<br />CONTACT: LEE DRUMMUND
<br />(760) 564-9400
<br />DEVELOPMENT CONTACTS
<br />BUILDING DEPARTMENT:
<br />SAN JOAQUIN COUNTY
<br />COMMUNITY DEVELOPMENT DEPT,
<br />1810 E. HAZELTON AVE
<br />STOCKTON, CA 95205
<br />(209) 468--3121
<br />HEALTH DEPARTMENT - FOOD:
<br />SAN JOAQUIN ENVIRONMENTAL
<br />HEALTH DEPARTMENT
<br />1868 E HAZELTON AVENUE
<br />STOCKTON, CA 95205
<br />(209) 468-3420
<br />CUPA:
<br />SAN JOAQUIN COUNTY
<br />ENVIRONMENTAL HEALTH DEPT
<br />1868 EAST HAZELTON AVE
<br />STOCKTON, CA 95205
<br />(209) 468-3420
<br />APCD:
<br />SAN JOAQUIN VALLEY
<br />AIR POLLUTION CONTROL DISTRICT
<br />NORTHERN REGION OFFICE
<br />4800 ENTERPRISE WAY
<br />MODESTO, CA 95356
<br />(209) 557-6400
<br />FIRE DEPARTMENT:
<br />SAN JOAQUIN COUNTY
<br />COMMUNITY DEVELOPMENT DEPT
<br />1810 E. HAZELTON AVE
<br />STOCKTON, CA 95205
<br />(209) 468-3121
<br />PUBLIC WORKS:
<br />SAN JOAQUIN COUNTY
<br />PUBLIC WORKS DEPT.
<br />1810 E. HAZELTON AVE
<br />STOCKTON, CA 95205
<br />(209) 468-3000
<br />WATER:
<br />CALIFORNIA WATER SERVICE
<br />1505 EAST SONORA ST
<br />STOCKTON, CA 95205
<br />547-7900
<br />SEWER:
<br />SEPTIC SYSTEM
<br />UTILITIES:
<br />PACIFIC GAS AND ELECTRIC
<br />(PG&E)
<br />(800) 743-5000
<br />DEFERRED SUBMITTALS
<br />-TRUSS SHOP DRAWINGS
<br />-SIGNAGE PERMITS
<br />-SOLAR PANEL/ WIRING/ DESIGN PLANS
<br />SPECIAL INSPECTIONS
<br />-SPECIAL INSPECTIONS: SEE STRUCTURAL SHEET S3.4 FOR REQUIREMENTS
<br />INDEX OF DRAWINGS
<br />** FOOD FACILITIES SUBMITTAL SHEETS
<br />GENERAL
<br />T1.1 ** COVER SHEET
<br />GC -1
<br />GREEN BUILDING CHECKLIST
<br />GC -2
<br />GREEN BUILDING CHECKLIST
<br />GC -3
<br />GREEN BUILDING CHECKLIST
<br />SURVEY
<br />ROOF FRAMING PLAN
<br />1 of 1
<br />TOPOGRAPHIC AND BOUNDARY SURVEY
<br />CIVIL
<br />DETAILS
<br />C1.0
<br />CIVIL - COVER SHEET
<br />C2.0
<br />CIVIL - SITE PLAN
<br />C2.1
<br />CIVIL - HORIZONTAL CONTROL PLAN
<br />C3.0
<br />CIVIL - DEMOLITION AND EROSION CONTROL PLAN
<br />C3.1
<br />CIVIL - EROSION CONTROL NOTES AND DETAILS
<br />C4.0
<br />CIVIL - GRADING PLAN
<br />C4.1
<br />CIVIL - STORM DRAIN PLAN
<br />C5.0**
<br />CIVIL -- UTILITY PLAN
<br />C5.1
<br />CIVIL - WATER NOTES
<br />C6.0
<br />CIVIL - NOTES AND DETAILS
<br />C6.1
<br />CIVIL - NOTES AND DETAILS
<br />C6.2
<br />CIVIL - NOTES AND DETAILS
<br />C7.0
<br />CIVIL - ARCO SITE SPECIFICATIONS
<br />C7.1
<br />CIVIL - ARCO SITE SPECIFICATIONS
<br />C7.2
<br />CIVIL - ARCO SITE SPECIFICATIONS
<br />LANDSCAPE
<br />FAULT CURRENT CALCULATIONS
<br />L1
<br />LANDSCAPE PLAN
<br />L2
<br />LANDSCAPE NOTES & DETAILS
<br />L3
<br />IRRIGATION PLAN
<br />L4
<br />IRRIGATION NOTES & DETAILS
<br />ARCHITECTURAL
<br />A1.1 **
<br />am/pm CONSTRUCTION FLOOR PLAN
<br />A1.1 a
<br />OVERALL BUILDING EXITING PLAN
<br />A1.1 b
<br />OVERALL BUILDING ACCESSIBILITY PLAN
<br />A1.2 **
<br />FLOOR FINISH PLAN
<br />A1.3 **
<br />REFLECTED CEILING PLAN
<br />A1.3a **
<br />SOFFIT PLAN
<br />A1.4
<br />ROOF PLAN
<br />A2.1
<br />EXTERIOR ELEVATIONS
<br />A2.3 **
<br />INTERIOR ELEVATIONS
<br />A2.4 **
<br />INTERIOR ELEVATIONS
<br />A2.5 **
<br />INTERIOR ELEVATIONS
<br />A2.6 **
<br />INTERIOR ELEVATIONS AND ENLARGED RESTROOM PLAN
<br />A2.7
<br />GRAPHIC ELEVATIONS
<br />A3.1
<br />BUILDING SECTIONS
<br />A3.2
<br />WALL SECTIONS
<br />A3.3
<br />WALL SECTIONS
<br />A4.1 **
<br />DETAILS
<br />A4.2 **
<br />DETAILS
<br />A4.3 **
<br />DETAILS
<br />A5.1
<br />DOOR AND WINDOW SCHEDULE
<br />A7.1
<br />ARCHITECTURAL SPECIFICATIONS
<br />A7.2
<br />ARCHITECTURAL SPECIFICATIONS
<br />A7.3
<br />ARCHITECTURAL SPECIFICATIONS
<br />A7.4
<br />ARCHITECTURAL SPECIFICATIONS
<br />A7.5
<br />ARCHITECTURAL SPECIFICATIONS
<br />A7.6
<br />ARCHITECTURAL SPECIFICATIONS
<br />Q1.1 ** EQUIPMENT PLAN
<br />Q1.2 ** COOLER PACKAGE
<br />Q2.1 ** EQUIPMENT SCHEDULE
<br />Q2.3 ** SMALL WARES SCHEDULE
<br />TE.1 ** TRASH / RECYCLE ENCLOSURE PLANS
<br />TE.2 ** TRASH / RECYCLE ENCLOSURE PLANS
<br />STRUCTURAL - C -STORE
<br />SOA
<br />LOT LIGHT STRUCTURAL NOTES AND DETAIL
<br />S1,1
<br />FOUNDATION PLAN
<br />S1.2
<br />CEILING FRAMING PLAN
<br />S1.3
<br />ROOF FRAMING PLAN
<br />S21
<br />DETAILS
<br />S2.2
<br />DETAILS
<br />S2.3
<br />DETAILS
<br />S2.4
<br />DETAILS
<br />S2.5
<br />DETAILS
<br />S2.6
<br />DETAILS
<br />S2.7
<br />DETAILS
<br />S2.8
<br />DETAILS
<br />S2.9
<br />DETAILS
<br />S2.10
<br />ELEVATIONS
<br />S3.1
<br />GENERAL NOTES
<br />S3.2
<br />GENERAL NOTES
<br />S3,3
<br />GENERAL NOTES
<br />S3,4
<br />GENERAL NOTES
<br />7.1�I�7,'�1:Zil:[IfC�llli1J:711
<br />CA.1
<br />CANOPY SLAB PLAN
<br />CA.2
<br />CANOPY ELEVATIONS
<br />CA.3
<br />CANOPY REFLECTED CEILING PLAN
<br />CANOPY-
<br />STRUCTURAL
<br />CS1
<br />COVER SHEET
<br />E1
<br />FRAMING PLAN
<br />E2
<br />ELEVATIONS
<br />E3
<br />LIGHTING AND SOFFIT PLAN
<br />E4
<br />SECTION
<br />E5
<br />SECTION
<br />F1
<br />FOUNDATION PLAN
<br />PLUMBING
<br />PLAN
<br />PO.1 **
<br />PLUMBING LEGEND, NOTES, SCHEDULES
<br />P0.2 **
<br />PLUMBING NOTES & SCHEDULES
<br />P2.0 **
<br />SANITARY DRAINAGE & VENT PLUMBING PLAN
<br />P3.0 **
<br />WATER PLUMBING PLANT
<br />P4.0
<br />PLUMBING ROOF PLAN
<br />P5.0 **
<br />SANITARY
<br />& WATER RISER
<br />P&O **
<br />PLUMBING
<br />DETAILS
<br />P6.1 **
<br />PLUMBING
<br />DETAILS
<br />P6.2 **
<br />PLUMBING
<br />DETAILS
<br />INDEX OF DRAWINGS -CONT
<br />MECHANICAL
<br />MO.1 ** EQUIPMENT SCHEDULE, LEGEND, NOTES
<br />MO.2 ** MECHANICAL SPECIFICATIONS
<br />MO.3
<br />MECHANICAL
<br />T-24
<br />FORMS
<br />MO.4
<br />MECHANICAL
<br />T-24
<br />FORMS
<br />MO.5
<br />MECHANICAL
<br />T-24
<br />FORMS
<br />MO.6
<br />MECHANICAL
<br />T-24
<br />FORMS
<br />MO.7
<br />MECHANICAL
<br />T-24
<br />FORMS
<br />M2.1 **
<br />MECHANICAL
<br />FLOOR
<br />PLAN
<br />M2.2
<br />MECHANICAL
<br />ROOF
<br />PLAN
<br />M6.1 **
<br />MECHANICAL
<br />DETAILS
<br />M6.2 **
<br />HOOD & FAN SHOP DRAWINGS
<br />M9.1 **
<br />CONTROLS
<br />ELECTRICAL ROOF PLAN
<br />E4.0
<br />ELECTRICAL
<br />EO.1
<br />LEGEND, NOTES & SCHEDULES
<br />EO.2
<br />SPECIFICATIONS
<br />E0.3.1
<br />SINGLE LINE DIAGRAM
<br />EO.3.2
<br />ELECTRICAL PANEL SCHEDULES
<br />EO.4
<br />TITLE 24 FORMS -INDOOR LIGHTING PART 1
<br />EO.5
<br />TITLE 24 FORMS -INDOOR LIGHTING PART 2
<br />EO.6
<br />TITLE 24 FORMS -OUTDOOR LIGHTING PART 1
<br />EO.7
<br />TITLE 24 FORMS -OUTDOOR LIGHTING PART 2
<br />EO.8
<br />TITLE 24 FORMS -SOLAR FORMS
<br />EO.9
<br />TITLE 24 FORMS -SOLAR FORMS
<br />ED.10
<br />TITLE 24 FORMS -SIGN FORMS
<br />EO.11
<br />TITLE 24 FORMS -POWER FORMS
<br />E1.0
<br />LIGHTING PLAN
<br />E2.0
<br />POWER PLAN
<br />E2.1
<br />ELECTRICAL ROUGH -IN PLAN
<br />E2.2
<br />ELECTRICAL & RECEPTACLE SCHEDULES
<br />E2.3
<br />POWER & LIGHTING SITE PLAN
<br />E3.0
<br />ELECTRICAL ROOF PLAN
<br />E4.0
<br />COMMUNICATION PLAN
<br />E5.0
<br />DIAGRAMS & DETAILS PART 1
<br />E5.1
<br />DIAGRAMS & DETAILS PART 2
<br />E5.2
<br />FAULT CURRENT CALCULATIONS
<br />PETROLEUM PLANS
<br />G.O.O TITLE SHEET AND DRAWING INDEX
<br />G.O.2.0 UNDERGROUND TANK AND PIPING SITE PLAN AND INSTALLATION NOTES
<br />G.0.2.1 TANK & PIPING SCOPE OF WORK & GENERAL NOTES (FRP 1 OF 2)
<br />G.0.2.2 TANK & PIPING SCOPE OF WORK & GENERAL NOTES (FRP 2 OF 2)
<br />G.0.5 DESIGN INTENT MISCELLANEOUS DETAILS AND VACUUM MONITORING
<br />DIAGRAM
<br />G.0.6.5 DESIGN INTENT: NEW VENT STACK INSTALLATION DETAILS W/
<br />HORIZONTAL FFA/HEALY CLEAN AIR SEPARATOR
<br />G.0.7.2 TANK FILL & VAPOR RISER STATIC GROUNDING DETAILS
<br />(CALIFORNIA ONLY)
<br />M.5.3.01 TANK AND PIPING MATERIALS LIST (1 OF 2)
<br />M.5.3.02 TANK AND PIPING MATERIALS LIST (2 OF 2)
<br />M.5.3.03 TYPICAL 25,000 GALLON DOUBLE WALL FIBERGLASS TANK INSTALLATION
<br />DETAILS
<br />M.5.3.05 TYPICAL 12,000/10,000 GALLON DOUBLE WALL FIBERGLASS TANK
<br />INSTALLATION DETAILS
<br />M.5.3.08 UST INSTALLATION (1) 10'0 25K & (1) 10'0 12K/10K BLENDING, DOUBLE
<br />WALL VENT & VAPOR W/DIESEL
<br />M.5.3.12 TURBINE SIDE SUMPS AND PIPING INSTALLATION DETAILS
<br />M.5.3A6 FILL SIDE SUMP INSTALLATION DETAILS (DOUBLE WALL VENT/VAPOR)
<br />M.5.3.18 DIESEL FILL SIDE SUMP INSTALLATION DETAILS (DOUBLE WALL VENT)
<br />M.5.3,23 DISPENSER DETAILS: WAYNE OVATION (3+0) BLEND DISPENSER
<br />INSTALLATION DETAILS (D.W. VAPOR)
<br />M.5.3.25 DISPENSER DETAILS: WAYNE OVATION (3+1) BLEND DISPENSER
<br />INSTALLATION DETAILS (D.W. VAPOR)
<br />M.5.3.26 TANK SLAB CONCRETE SPECIFICATIONS & IDENTIFICATION
<br />MARKING DETAILS
<br />M.5.3.27 ELECTRICAL FUELING SITE PLAN
<br />M.5.3.28 ELECTRICAL FUELING POINT-TO-POINT CONDUIT PLAN
<br />M.5.3.29 IST-VFC, CAT 5, AND VEEDER-ROOT NOTES
<br />M.5.3.30 ELECTRICAL FUELING DETAILS FOR VEEDER-ROOT & POWER
<br />DISTRIBUTION CENTER (25K 12K/10K TANKS)
<br />M.5.3.31 ELECTRICAL PANEL POWER AND CONTROL WIRING DETAILS
<br />M.5.3.32 ELECTRICAL PANEL E -STOP CONTROL WIRING SCHEMATIC AND TYPICAL
<br />FUELING ELEVATION
<br />M.5.3.33 ELECTRICAL PANEL E -STOP DATA/INTERCOM/MEDIA WIRING DIAGRAMS
<br />M.5.3.34 EMERGENCY SHUTDOWN SCHEMATIC FUELING CONTROL W/VFC's
<br />M.5.3.35 EMERGENCY SHUTDOWN DETAILS FUELING CONTROL W/VFC's
<br />SAN JOAQUkN COUNTY
<br />ENVIRONMENTAL HEALTH DEPARTMENT
<br />1868 E. HAZELTON AVE.
<br />STOCKTON, CA 95205
<br />(209) 488-3420
<br />❑ Approved
<br />' Approved with changes: See Remarks
<br />❑ Disapprov d Seeemark 4
<br />Remarks _a '[�--
<br />Date By
<br />Approvalxte ds only to that which is shown and described
<br />hereon and does not aulhorize or approve any omission or
<br />deviation from requirements of state laws or local ordinances.
<br />CLIENT:
<br />bp
<br />ARCO
<br />BP WEST COAST PRODUCTS, LLC
<br />OV4AU`A
<br />V'
<br />40
<br />d
<br />�w
<br />NC
<br />ENGIN
<br />18215 72ND AVENUE SOUTH
<br />KENT, WA 98032
<br />(425)251-6222
<br />(425)251-8782 FAX
<br />CIVIL ENGINEERING, LAND PLANNING,
<br />SURVEYING, ENVIRONMENTAL SERVICES
<br />NO.
<br />DATE
<br />REVISION DESCRIPTION
<br />-
<br />02/22/18
<br />PERMIT SUBMITTAL
<br />t
<br />2
<br />3
<br />0
<br />A
<br />0
<br />to
<br />11
<br />SEAL:
<br />OE CALIFO
<br />DANIEL BRIAN �
<br />GOALWIN
<br />REN.8-31-2019
<br />yse'0 ARG\
<br />DEVELOPMENT INFORMATION:
<br />ARCO NTI
<br />AM/PM
<br />FUEL CANOPY w/ 8 MPD's
<br />SITE ADDRESS:
<br />NWC CHEROKEE RD
<br />@ NEWTON RD
<br />SAN JOAQUIN COUNTY, CALIFORNIA
<br />FACILITY #TBD
<br />DESIGNED BY:
<br />ALLIANCE Z&OM:
<br />OIEO(ED BY:
<br />BP REPM:
<br />DRA94N BY:
<br />ALLIANCE PAI:
<br />VERSION: _
<br />PROTECT NO:
<br />18068
<br />DRAWING TITLE:
<br />COVER SHEET
<br />SHEET NO:
<br />T191
<br />
|