Laserfiche WebLink
SAN FRANCISCO FRENCH BREAD,STOCKTON, CA SECc.d Project No.50090-011-03 <br /> II. GENERAL SITE REQUIREMENTS AND BACKGROUND INFORMATION <br /> A. Health and Safety Plan Responsibilities <br /> • Prior to beginning on-site work, the Project Manager will ensure Attachments 1-4 are <br /> completed. <br /> F <br /> • The Site Health and Safety Officer(SHSO)will ensure Attachments 5-8 are completed the <br /> first day of on-site work. Within 24 hours of the end of field work,the SHSO will submit the <br /> completed HASP to the Health and Safety Coordinator(HSC). <br /> • The Site Health and Safety Officer will oversee the overall Plan. He/she has the authority to <br /> stop work or prohibit any personnel from working on the site at any time for not complying <br /> with any aspect of the Plan. <br /> • The Subcontractor Field Supervisor is responsible for implementing the Plan for his/her own <br /> employees. <br /> • Each person on the site has responsibility for their own health and safety,as well as assisting <br /> others in carrying out the Plan. Any person observed to be in violation of the Plan should be <br /> assisted in complying with the Plan,or reported to the Site Health and Safety Officer or the <br /> Subcontractor Field Supervisor. <br /> • Any site personnel may shut down field activities if there is a real or perceived immediate <br /> danger to life or health. <br /> B. Minimum Training,Respirator Fit-Testing,and Medical Surveillance Requirements for Site <br /> Personnel <br /> • 40 hr. Hazardous Waste Operations Training(HAZWOPER) <br /> • 8 hr. Annual HAZWOPER Refresher Training <br /> • 8 hr. Supervisor HAZWOPER Training for Site Health and Safety Officer <br /> • First Aid and CPR Training for Site Health and Safety Officer <br /> • Annual Respirator Fit Testing <br /> • Annual Medical Clearance <br /> C. Purpose of Field Work: <br /> Advance two(2)soil borings to 50 feet bgs and collect soil samples to confirm the extent of petroleum <br /> hydrocarbons in soil and groundwater: install two(2)groundwater monitoring wells,develop wells: <br /> collect groundwater samples for chemical analyses: and perform routine quarterly groundwater <br /> sampling of the wells on-site. <br /> D. Detailed Description of Specific Tasks Planned(Number each separate task in order of progression. <br /> The task numbers assigned here will be referred to throughout the Plan): <br /> I. Utility Locate and traffic control <br /> 2. Advance and sample two (2) boreholes with a hollow stem drill rig to a depth of 50 feet. <br /> 3. Install two(2) groundwater monitoring wells. <br /> 4. Develop new monitoring wells and collect soil and groundwater samples. <br /> 5. Quarterly sampling of groundwater from three monitoring wells. <br /> HASFFMSTOCKTONUNCOLNIHS -4- <br />