Laserfiche WebLink
13 October 2006 <br /> AGE-NC Project No. 04-1207 <br /> Page 2 of 4 <br /> through Underground Service Alert. <br /> 2.2. DRILLING AND SOIL SAMPLE COLLECTION <br /> AGE proposes to advance one pilot soil boring at the site for the installation of a shallow ground <br /> water monitoring well.Using a CME-75HT truck-mounted drill rig equipped with 8.25-inch hollow- <br /> stem augers,the pilot boring will be advanced to a depth of 65 feet bsg. The total depth of the well <br /> boring may vary according to geologic/hydrogeologic conditions encountered during drilling. The <br /> proposed boring is to be advanced east of the former UST area, as depicted on Figure 2. <br /> Selected soil samples will be analyzed by a State of California Department of Health Services <br /> (DHS)-certified laboratory for the following constituents: <br /> • Total petroleum hydrocarbons quantified as gasoline (TPH-g) in accordance with EPA <br /> Method 8015M; <br /> • Benzene,toluene,ethylbenzene,and total xylenes(BTEX)and fuel additives methyl tertiary- <br /> butyl ether(MTBE),tertiary-butyl alcohol(TBA),di-isopropyl ether(DIPE),ethyl tertiary- <br /> butyl ether(ETBE),tertiary-amyl methyl ether(TAME), 1,2-dibromoethane(EDB),and 1,2- <br /> dichloroethane (1,2-DCA) in accordance with EPA Method 826013; and <br /> • Total lead in accordance with EPA Method 6010. <br /> Laboratory reports of soil analysis, testing methods, laboratory quality assurance/quality control <br /> (QA/QC) reports, and sample chain of custody documentation will be presented in a report of <br /> findings and recommendations. <br /> 2.3. MONITORING WELL INSTALLATION, DEVELOPMENT, & SURVEY <br /> The pilot soil boring will be completed as a single-level ground water monitoring well screened from <br /> 45 feet to 65 feet bsg.Following installation,the well will be developed to maximize water flow and <br /> minimize the amount of fine-grained sediment drawn into the well during pumping or bailing. The <br /> top of the newly installed well casing(well head)will be surveyed to determine its elevation relative <br /> to mean sea level. <br /> 2.4. GROUND WATER SAMPLING AND ANALYSIS <br /> Following the installation of the new monitoring well, ground water monitoring and sampling <br /> Advanced GeoEnvironmental,Inc. <br />