My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
2025
>
2900 - Site Mitigation Program
>
PR0507203
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2020 8:49:04 PM
Creation date
3/2/2020 2:04:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0507203
PE
2950
FACILITY_ID
FA0007734
FACILITY_NAME
LAKESPUR ESTATES (PROPOSED)
STREET_NUMBER
2025
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
2025 S MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLEINFELDER <br /> • The client will be responsible for locating all underground utilities and other subsurface <br /> structures that could interfere with drilling operations or be damaged during drilling. <br /> Failure to locate such lines or structures will be the sole responsibility of the client. <br /> Underground Services Alert (USA) at 1-800-642-2444 provides this service free of charge <br /> for major utility lines. Kleinfelder can make contact with USA for a site visit, if <br /> requested. <br /> IV. PROJECT TIME SCHEDULE <br /> Upon receipt of our signed contract, the estimated time schedule will be as follows: <br /> STANDARD ANALYTICAL TURN-AROUND TIME <br /> Approximate Time Task <br /> Week- 0 Notification of proposal acceptance in writing(signed contract) <br /> Week 0 - 2 Task 1 and Task 2 - Workplan Preparation, Permitting*, and Soil <br /> Sample Collection <br /> Week 2 - 4 Task 2 - Chemical Analyses** <br /> Week 4 - 5 Task 3 - Reporting <br /> * The time estimated for permitting is approximate. Kleinfelder has no control over the time <br /> expended for regulatory agency activities. <br /> ** Kleinfelder has no control over chemical analysis involved with the project. It is possible that <br /> delays could occur; however, Kleinfelder will make every effort to expedite the process. <br /> V. AUTHORIZATION <br /> Attached to this proposal is our firm's standard "Engineering Services Agreement." Receipt of <br /> our agreement signed by the client with the desired services initialed will serve as our firm's <br /> formal authorization to proceed on this project. We will, of course, have to approve any <br /> requested changes of our scope and contract terms before proceeding. <br /> All terms and conditions indicated in this proposal and our attached contract will be considered <br /> by both parties to be in effect from the effective date of the executed contract through completion <br /> of the project. The proposal will remain in effect for 60 days from the date shown on the <br /> proposal and therefore shall be null and void unless our contract has been signed for the work <br /> performed. <br /> 20-YP7-199/2017P151/2017024 Page 4 of 6 <br /> Cc> 1997 Kleinfelder, Inc. October 27, 1997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.