Laserfiche WebLink
1QL-P-5000011 MII.-p-: <br /> and shall be free iraa precipitated chemicals or crystals at the conclusion appropi <br /> of the 6 hoar vwmm* period. shall t <br /> 3.7 Yorhsmnshi . The compounds obtained under this specification shall be <br /> free of dl , wood chips, or other foreign material. The liquid compounds 4.4.1 <br /> as furnished shall be clear and free from insoluble natter. shall <br /> to cosy <br /> 4. QUU lTr ASSUBAIICE PROVISIONS batch. <br /> 4.1 Responsibility for inspection. Unless otherwise specified in the con- 4.4. <br /> tract or purchase order, the supplier is responsible for the performance of with t' <br /> all inspection requirements as specified herein. Except as otherwise speci- metbod <br /> fied in the contract or order, the supplier may use his own or any other chemic <br /> facilities suitable for the performance of the inspection requirements speci- by the <br /> fied herein, unless disapproved by the Government. The Government reserves otherw <br /> the right to perform any of the inspections set forth in the specification shalt <br /> where such inspections are deemed necessary to assure supplies and services <br /> conform to prescribed requirements. 4.5 <br /> 4.2 Lot. A lot shall consist of the phospLating compound produced by one cats s <br /> manufacturer in 8 consecutive hours of continuous production, with no change tions <br /> in facilities, materials or process which would change the chemical or physi- <br /> cal properties of the compound. In the event the process is a batch opera- 4.5- <br /> tion, each batch shall constitute - lot. Pba;"iz <br /> flask. <br /> 4.3 SsaPpling. soluti <br /> rise : <br /> 4.3.1 ding for nondestructive examination. A random sample of filled <br /> containers shall be selected in accordance with MIL-STD-105 at inspection 4.g. <br /> level S-4 and acceptable quality level (AQL) equal to 2.5 percent defective deters <br /> to verify compliance with all requirements of this specification regarding <br /> pbysical fora, fill, container, closure and marking. 4.5, <br /> 4.3.2 Sampling for tests. Three separate 1-pound samples (whether liquid aiLM I <br /> or dry) shall be taken from each inspection lot. Yben the material is pro- 0103011_ <br /> dueed by a batch process the three samples shall be taken at different loca- and bo <br /> tions within each batch or from three separate containers. G'hen the material solve` <br /> is produced by a continuous run process the three samples shall be taken to 4.5 <br /> represent, respectively, the first part, the middle past, and the last part 4.5.1 <br /> of the run of the constituted inspection lot. The samples shall be compos- <br /> ited in clean, dry, glass containers, sealed and marked for identification. water <br /> of va <br /> 4.4 Inspection. Stir <br /> exact <br /> 4.4.1 Nondestructive enmination. Each sample filled container as sr-A- stirr <br /> fled in 4.3.1 sha-U be examidned fUr- defects of the container and the closure, the p <br /> for evidence of look- and for unsatisfactory markings. The compound in of me <br /> each container shall be examined for uniformity, segregation and caking to and w <br /> determine compliance with 3.1. Any container in the sample having one or 105 t <br /> mors defects, or under required fill, shall be refected, and if the number phosp <br /> of defective containers in any sample exceeds the acceptance number of the <br /> 5 <br /> «03 2� <br />