My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
333
>
2900 - Site Mitigation Program
>
PR0545445
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2020 4:40:31 PM
Creation date
3/3/2020 4:20:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545445
PE
2961
FACILITY_ID
FA0025798
FACILITY_NAME
CALIFORNIA ARMY NATIONAL GUARD
STREET_NUMBER
333
Direction
N
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04123045
CURRENT_STATUS
02
SITE_LOCATION
333 N WASHINGTON ST
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
699
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Marcus Pierce,Engineering Geologist <br /> Central Valley Regional Water Quality Control Board <br /> Subject: Diesel Impacted Soil Removal <br /> • Follow-Up Phase: Ongoing checks to ensure continuing compliance with Work Plan and <br /> contract requirements are performed, including control testing as necessary, and all <br /> potential deficiencies are corrected before they can adversely affect the project. <br /> Near completion of the work, the Project QC Manager will perform an inspection with on-site <br /> personnel to verify that the work is completed in accordance with the Work Plan. If any potential <br /> deficiencies are identified,the QC Manager will develop a punch list of activities intended to <br /> correct those deficiencies. All items on the list, as necessary, will be corrected before a final <br /> inspection is performed. <br /> The Field Manager will maintain on-site current records of all control activities and tests, as <br /> appropriate. These will include evidence that the required control phases and tests have been <br /> performed, including the number and results, nature of defects, causes for rejection, defective <br /> features, proposed remedial action, and a statement that all supplies and materials incorporated <br /> in the work are in full compliance with the terms of the contract. <br /> CLOSING <br /> We appreciate your cooperation in scoping and coordinating this effort. If you have any <br /> questions or comments regarding this submittal, please contact one of the undersigned at <br /> 925.906.9698, or Mr. Michael Holder of the CA ARNG at 916.369.4338. <br /> Sincerely, <br /> i <br /> 0 1 '7-1 t*��n <br /> V __ �`r�k.�yC� �\ �p <br /> James Medley tichael'E. Quillin, P.G. <br /> Project Scientist Project Manager MCL au to N <br /> No• 8 5 . <br /> Attachments: AXP• <br /> Attachment A— Figures <T oP <br /> Attachment B —San Joaquin County Environmental Health Department \F OFGF�N_ <br /> September 30, 2009 Notice to Abate Immediately <br /> Attachment C—Accident Prevention Plan/Site-Specific Health and Safety Plan <br /> cc: Mr. Michael Holder, CA ARNG <br /> Mr. Gary Krongard, USACE—Sacramento <br /> Mr. Ray von Flue, EHD <br /> SFC Thomas Lane, CA ARNG Lodi Armory <br /> Oneida Total Integrated Enterprises,LLC(OTIE) Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.