Laserfiche WebLink
APP <br /> Well Installation and Sampling at California National Guard Field Maintenance Shop <br /> Stockton, California <br /> Table 1. List of AHAs <br /> AHA Number Description <br /> 01 Mobilization <br /> 02 Underground Utility Clearance <br /> 03 Soil Sampling <br /> 04 Soil Excavation <br /> 05 Off-Site Transport and Disposal <br /> 06 Demobilization <br /> 2.5 SCOPE AND APPLICATION OF THE ACCIDENT PREVENTION PLAN SITE SAFETY AND <br /> HEALTH PLAN <br /> This APP/SSHP addresses the safety and health practices and controls that will be <br /> implemented by all OTIE employees and its subcontractors participating in the California <br /> National Guard Armory Soil Excavation project activities. <br /> Activities performed under this APP/SSHP will comply with applicable sections of the U.S. Army <br /> Corps of Engineers' (USACE) Safety and Health Requirements Manual (EM 385-1-1, 15 <br /> September 08). In addition, select work practices and procedures from OTIE's Corporate Safety <br /> and Health Program will be incorporated into this plan by reference. Modifications to the <br /> APP/SSHP will be reviewed and approved by OTIE's Project Manager (PM) and Corporate <br /> Safety and Health Manager (SHM). <br /> The safety and health guidelines in this plan were prepared specifically for this contract and <br /> should not be used on other projects. <br /> The SSHP for this project site is located in Appendix I of the APP. Amendments to the SSHP <br /> will be included as an Appendix to the SSHP. Amendments to the APP will be included as <br /> Appendix J. <br /> OTIE 4 <br />