My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
333
>
2900 - Site Mitigation Program
>
PR0545445
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2020 4:40:31 PM
Creation date
3/3/2020 4:20:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545445
PE
2961
FACILITY_ID
FA0025798
FACILITY_NAME
CALIFORNIA ARMY NATIONAL GUARD
STREET_NUMBER
333
Direction
N
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04123045
CURRENT_STATUS
02
SITE_LOCATION
333 N WASHINGTON ST
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
699
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APP <br /> Well Installation and Sampling at California National Guard Field Maintenance Shop <br /> Stockton, California <br /> Refer to plan below: <br /> Principal Potential Recommended Controls <br /> Steps Safety/Health <br /> Hazards <br /> Severe Severe Weather Monitor local weather through available media or a weather radio. <br /> Weather Alert Thunderstorm During daily safety meetings, address inclement weather procedures: <br /> • Heavy Rain <br /> • High Lightning and/or Thunder: <br /> Winds/Tornado Equipment shutdown <br /> • Earthquake Proceed to support zone <br /> Await further instruction from Project Manager or SSHO <br /> Heavy Rain/Wind: <br /> If visibility is affected, shut down equipment <br /> Proceed to support zone <br /> Await further instructions from the SSHO <br /> Tornado: <br /> Equipment shut down <br /> Proceed to support zone <br /> Await further instructions from the SSHO <br /> Earthquake: <br /> Shelter in Place <br /> Following event-Equipment shut down and Proceed to support zone <br /> Await further instructions from the SSHO <br /> NOTE:A 30-minute STAND DOWN period is required after encountering Lightning,Thunder, Heavy Rain,or <br /> Wind in order to allow the storm to pass.Verification from the National Weather Service for an ALL CLEAR is <br /> also advised prior to re-commencing work. <br /> 9.22 FLOAT PLAN (19.F.04) <br /> This Plan is N/A for this project site. <br /> 9.23 SITE-SPECIFIC FALL PROTECTION AND PREVENTION PLAN (21.C) <br /> No work at height by TN&A is planned for work activities; therefore, a fall protection plan is not <br /> necessary for this project. All equipment on site that includes platforms or steps requiring <br /> guards or handholds must be equipped appropriately. Where necessary, fall hazards are <br /> addressed in the AHAs. Drivers/passengers seated in vehicles that have foot and hand holds <br /> shall use these while embarking/disembarking from those vehicles. <br /> 9.24 DEMOLITION PLAN (TO INCLUDE ENGINEERING SURVEY) (23.A.01) <br /> This Plan is N/A for this project site. <br /> 9.25 EXCAVATION/TRENCHING PLAN (25.A.01) <br /> This Plan is N/A for this project site. <br /> 9.26 EMERGENCY RESCUE(TUNNELING) (26.A) <br /> This Plan is N/A for this project site. <br /> OTIE 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.